Technical Blog Post
Abstract
As with all Interim Fixes, Maximo Asset Management 7.6.1.0 interim fix is cumulative. It includes all fixes contained in earlier Interim Fixes, with the addition of new fixes listed in this post.
Body
TPAE 7.6.1.0 interim fix 011 is available at Fix Central.
APAR |
Application Name |
Description |
---|---|---|
IJ16322 |
Work Order Tracking |
If an Anywhere user clicks the timer button on a work order, the scheduled start date of the work order is updated to the current system date. |
IJ15750 |
All Applications |
In all applications, attackers can gain access to sensitive information that they are not authorized to view. |
IJ14488 |
All Applications |
In all applications, old PDF attachments that do not contain trailers cannot be printed. |
IJ08818 |
Graphical Scheduling |
In the Graphic Scheduling application, the Refresh When Opening Gantt View option does not include updates. |
IJ15795 |
Graphical Assignment |
In the Graphical Assignment application, calendar breaks ignore the Assign Available Labor option. |
IJ16087 |
Graphical Assignment |
In the Graphical Assignment application, if a work order has multiple assignments and you drag the work bar for one of the assignments to a future date, the duration of the assignment increases. |
IJ17328 |
Graphical Assignment |
In the Graphical Assignment application, if the Go To Work Order Tracking functionality is invoked for a child work order, the parent work order is shown. |
IJ16223 |
Graphical Assignment |
In the Graphical Assignment application, the Run Optimization action fails with an error. |
IJ16535 |
Graphical Assignment |
In the Graphical Assignment application, the functionality that allows users to jump to a particular date in the schedule is not working. |
IJ17388 |
Graphical Assignment |
In the Graphical Assignment application, the optimizer assigns work to unavailable resources. |
IJ16490 |
Graphical Assignment |
In the Graphical Assignment application, the right-click menu is not implemented for gray assignment bars. |
IJ16279 |
Graphical Assignment |
In the Graphical Scheduling and Graphical Assignment applications, when planned labor assignments are thousands of hours long, the date ribbon does not display hours. |
IJ16417 |
Graphical Scheduling |
In the Graphical Scheduling application, a new schedule that includes a work query cannot be created. |
IJ13571 |
Graphical Scheduling |
In the Graphical Scheduling application, any changes to the segments of a schedule for a forecast do not turn red. The record line should become red after any date change. |
IJ13934 |
License Usage Monitor |
In the License Usage Monitor application, Work Center applications cannot be added to a license. |
IJ16437 |
Locations |
In the Locations application, if a location is associated with a linear asset, the location map does not open. |
IJ08473 |
Preventive Maintenance |
In the Preventive Maintenance application, the preventive maintenance forecast does not consider the value of the PMFORECAST.NEWDATE field. |
IJ16808 |
Scheduler |
In the Scheduler application, the optimizer assigns work orders to time slots that are already reserved for manually assigned work orders. |
IJ16598 |
Service Requests |
In the Service Requests application, users can view services that they are not authorized to view. |
IJ15597 |
Software Catalog |
In the Software Catalog application, attackers can execute malicious scripts. |
IJ13077 |
Solutions |
In the Solutions application, the previous Solution record's attachment is added to the next Solution record that you create and cannot be deleted. |
IJ17381 |
Graphical Assignment |
Notes that are added to a work order in the Work Order Tracking application are not visible for that work order in the Graphical Assignment application. |
IJ15988 |
Graphical Assignment |
Recent changes to the Assignment Manager reports need to be retrofitted to the Graphical Assignment reports. |
IJ16219 |
Master PM (Cal) |
When a master PM does not have an extended date, and the Update Associated PMs action is selected, an unexpected warning appears. |
IJ17005 |
All Applications |
When a user logs in using two different browser sessions, then closes both session windows without logging out, the token licenses are not returned. |
IJ15890 |
Cron Task Setup |
When two phone records are added for a user In the LDAPSYNC cron task setup, the cron task creates only one phone record for the user in the database. |
IJ17250 |
Graphical Assignment |
When you invoke the Go To Work Order Tracking functionality to update a work order description, the description is not refreshed in the Graphical Assignment application. |
IJ11268 |
Item Master |
When you run the item order status report and then select a hyperlinked item number from the list of records, an error occurs. |
IJ05695 |
Report |
In the Report application, when you try to select either the Cognos Reporting action or the Launch Cognos Administration action, an error occurs. |
IJ16300 |
Map Manager |
In the Map Manager application, the Map Tips tab is not available for maps provided by certain map providers. |
IJ12950 |
System Object |
A number of Maximo Asset Management token licensing defects exist. |
IJ15437 |
Graphical Assignment |
In the Graphical Assignment application, the Available Labor list includes an inactive labor record. |
IJ16761 |
Graphical Scheduling |
In the Graphical Assignment application, if a schedule is created with the start date of a Friday, the schedule cannot be opened on the following Monday. |
IBM Control Desk 7.6.1.0 and 7.6.1.1 use Tivoli's process automation engine 7.6.1.0. This interim fix can be applied to Control Desk 7.6.1.0 and 7.6.1.1.
For product compatibility, see Control Desk, Maximo and TPAE version compatibility.
To install, see Installing an interim fix in Maximo 7.6.
UID
ibm11111377