APAR status
Closed as program error.
Error description
In Graphical Assignment (GA) grey bars are used to show assignments for WO outside the selected set of WO defined by the Work List's Work Queries. Clicking on the grey bars while holding down the Alt key (Alt-Left click) will display a dialog with basic information about the WO. But Right Clicking the bar will not display the standard Right Click menu or at least the Go To Work Order Tracking option. The Right Click menu has never been implemented for grey assignment bars in any version. STEPS TO REPRODUCE: 1. Go to the Calendars application and select the Day calendar. 2. If the End Date is not the end of next year, change it and Save. 3. Define/Apply Shifts - select DAY shift and apply it to the entire length of the calendar. 4. Go to WOTrack and create a new WO. Give it a Wonum of DPC1 and a Duration of 5. 5. On the Plans tab give it Planned Labor of ELECT Firstclass. 6. On the Assignments tab use the Available Labor to assign it to Liberi. 7. Make another new WO, wonum DPC2, duration 5. Planned Labor of ELECT Firstclass. Save. 8. Go to GA. Create a new Work List. 9. Use Calendar DAY, Shift DAY. 10. Create a Work Query to select only wonum DPC2: wonum = 'DPC2' 11. Save and click on the Assignments tab. 12. You will see a grey bar on the row for Liberi representing the assignment made for WO DPC1. 13. Alt-Left click that grey bar and you will information for DPC1. 14. Right click on the grey bar and nothing will happen. 15. Right click on the orange bar on the ELECT row, the Planned Labor for DPC2, and you will see a menu where one of the options is Go To Work Order Tracking. RESULTS: The Right Click menu appears for the orange bar but not for the grey bar. EXPECTED RESULTS: The Right Click menu should appear for the grey bar. It may not have alll the options as for the orange bar but it should have at least Go To Work Order Tracking. VERSION INFORMATION: All Maximo versions
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * Users of the Graphical Assignment application in Scheduler * * 7.6.7. * **************************************************************** * PROBLEM DESCRIPTION: * * IN GRAPHICAL ASSIGNMENT THE RIGHT CLICK - GO TO * * WOTRACKFUNCTION FOR GREYED OUT ASSIGNMENTS IS MISSING. * **************************************************************** * RECOMMENDATION: * ****************************************************************
Problem conclusion
A code fix has been made.
Temporary fix
Comments
APAR Information
APAR number
IJ16490
Reported component name
MAXIMO SCHEDULE
Reported component ID
5724R46SE
Reported release
767
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-05-29
Closed date
2019-06-05
Last modified date
2019-06-05
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
MAXIMO
Fix information
Fixed component name
MAXIMO SCHEDULE
Fixed component ID
5724R46SE
Applicable component levels
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"767","Edition":"","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
05 June 2019