IBM Support

SI53003 - INCORROUT No target flash copy not allowed when source node

PTF Cover Letter


PTF ( Program Temporary Fixes ) Cover letter


Order this fix

Abstract

INCORROUT No target flash copy not allowed when source node


Pre/Co-Requisite PTF / Fix List

REQ  LICENSED           PTF/FIX  LEVEL

TYPE PROGRAM  RELEASE   NUMBER   MIN/MAX  OPTION
---- -------- --------- -------  -------  ------
NONE



NOTICE:
-------
Application of this PTF may disable or render ineffective programs that
use system memory addresses not generated by the IBM translator,
including programs that circumvent control technology designed to limit
interactive capacity to purchased levels.  This PTF may be a prerequisite
for future PTFs.  By applying this PTF you authorize and agree to the
foregoing.

This PTF is subject to the terms of the license agreement which
accompanied, or was contained in, the Program for which you are obtaining
the PTF.  You are not authorized to install or use the PTF except as part
of a Program for which you have a valid Proof of Entitlement.

SUBJECT TO ANY WARRANTIES WHICH CAN NOT BE EXCLUDED OR EXCEPT AS EXPLICITLY
AGREED TO IN THE APPLICABLE LICENSE AGREEMENT OR AN APPLICABLE SUPPORT
AGREEMENT, IBM MAKES NO WARRANTIES OR CONDITIONS EITHER EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OR CONDITIONS OF
MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NON INFRINGEMENT,
REGARDING THE PTF.

The applicable license agreement may have been provided to you in printed
form and/or may be viewed using the Work with Software Agreements (WRKSFWAGR)
CL command.





APAR Error Description / Circumvention

-----------------------------------------------
No target flash copy is currently only allowed on the source
node. If the source node is down, then no flash can be taken.

CORRECTION FOR APAR SE58806 :
-----------------------------
No target flash copy can be done from any device domain node,
with preference given first to the flash source node, then to
the originating node if the node is in the same device domain as
the flash, and finally to any device domain node.

CIRCUMVENTION FOR APAR SE58806 :
--------------------------------
None.


Activation Instructions


None.




Special Instructions


On each node in the cluster, end clustering, apply the fix, and then
start clustering.  It is not necessary to update all nodes at the same
time, however, any node without the fix will continue to be a potential
source of the problem.

********************************************************************
THE FOLLOWING ARE SUPERSEDED SPECIAL INSTRUCTIONS. IF THE SUPERSEDED
PTF HAS ALREADY BEEN APPLIED AND ITS SPECIAL INSTRUCTION FOLLOWED,
IT IS NOT NECESSARY TO FOLLOW THAT SPECIAL INSTRUCTION AGAIN.
********************************************************************

SPECIAL INSTRUCTIONS FOR SUPERSEDED PTF SI52665 :
=================================================

On each node in the cluster, end clustering, apply the fix, and then
start clustering. It is not necessary to update all nodes at the same
time, however, any node without the fix will continue to be a potential
source of the problem.

Step #1:
In order for this PTF to be fully activated, you must end and restart
the QHASVR job.  You can do this by ending and starting the cluster
node using the commands:

ENDCLUNOD CLUSTER(<cluster-name>) NODE(<node-id>)
STRCLUNOD CLUSTER(<cluster-name>) NODE(<node-id>)

Or, you can end the QHASVR job under QSYSWRK subsystem:

ENDJOB JOB(<job-num>/QHAUSRPRF/QHASVR) OPTION(*IMMED)

where <job-num> is the job number.

Issue the WRKCLU command to restart the QHASVR job.

Step #2:
In order for this PTF to be fully activated, you must restart
the ADMIN2 instance of the *HTTP server.  Do this with the
following commands:

ENDTCPSVR  SERVER(*IAS) INSTANCE(ADMIN2)
STRTCPSVR  SERVER(*IAS) INSTANCE(ADMIN2)

Step #3:
Users must sign off any active sessions which may be using,
PowerHA and sign back on after the PTF has been applied.

SPECIAL INSTRUCTIONS FOR SUPERSEDED PTF SI51113 :
=================================================

Step #1:
In order for this PTF to be fully activated, you must end the cluster
and HTTP server.  You can do this by ending the cluster node and server
using the commands:
node using the commands:

ENDCLUNOD CLUSTER(<cluster-name>) NODE(<node-id>)
ENDSBS SBS(QHTTPSVR) OPTION(*IMMED)

Step #2:
Users must sign off any active sessions which may be using,
PowerHA and sign back on after the PTF has been applied.

Step #3:
Start the server and cluster using the commands:

STRTCPSVR SERVER(*HTTP) HTTPSVR(*ADMIN)
STRCLUNOD CLUSTER(<cluster-name>) NODE(<node-id>)


Default Instructions

THIS PTF CAN BE APPLIED IMMEDIATE OR DELAYED.



Supersedes

PTF/FIX NO(S).  APAR TITLE LINE
--------------  ------------------------------------------------------------
   SI52665      INCORROUT - Fixes of the bugs found in PowerHA in 7.2 releas
   SI51113      PowerHA 7.2 TVT
   SI51913      OSP-INCORROUT PowerHA pre-GA fixes
   SI51913      HA-INCORROUT Node Fails to Join Recovery Group when Cluster

Summary Information

System..............................  i
Models..............................  
Release.............................  V7R2M0
Licensed Program....................  5770HAS
APAR Fixed..........................  View details for APAR SE58806
Superseded by:......................  View fix details for PTF SI80112
Recompile...........................  N
Library.............................  QHASM
MRI Feature ........................  NONE
Cum Level...........................  C6085730


IBM i Support

IBM disclaims all warranties, whether express or implied, including, but not limited to, the implied warranties of merchantability and fitness for a particular purpose. By furnishing this document, IBM grants no licenses to any related patents or copyrights. Copyright © 1996,1997,1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018, 2019, 2020, 2021, 2022 IBM Corporation. Any trademarks and product or brand names referenced in this document are the property of their respective owners. Consult the Terms of use link for trademark information.

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Platform":[{"code":"PF012","label":"IBM i"}],"Version":"7.2.0","Product":{"code":"SWG60","label":"IBM i"},"Component":"5770HAS","Edition":"","Line of Business":{"code":"LOB57","label":"Power"}}]

Document Information

Modified date:
28 June 2022