Product Documentation
Abstract
8231-E2B (Power 710) and 8231-E2B (Power 730) - op panel installation movie
Content
Control panel installation
To install the control (op) panel, follow these steps:
- Connect the control panel signal cable to the back of the control panel.
- Lock the retainer arm in place until you feel its locking tabs secure it.
- Carefully slide the control panel into the control panel bay until you feel it snap in place.
NOTE: If the control panel does not lock in place, the media device cable might be in the path of the control panel signal cable. You must move the media device cable out of the path of the control panel signal cable before replacing the control panel.
For specific instructions for the removal and installation of hardware.
Document Location
Worldwide
[{"Type":"HW","Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"HW1N1","label":"Power->Power 710"},"Platform":[{"label":"Platform Independent","code":"PF025"}],"Line of Business":{"code":"","label":""}},{"Type":"HW","Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"HW1R1","label":"Power->Power 730"},"Platform":[{"label":"Platform Independent","code":"PF025"}],"Line of Business":{"code":"","label":""}}]
Was this topic helpful?
Document Information
Modified date:
24 January 2019
UID
ibm1MIGR-5087200