Common procedures for servicing or installing features in the 8348-21C
This section contains all the common procedures related to installing, removing, and replacing features in the IBM® Power® System S812LC (8348-21C) system.
- Before you begin
Observe these precautions when you are installing, removing, or replacing features and parts. - LEDs on the 8348-21C system
Use this information as a guide to the LEDs on the IBM Power System S812LC (8348-21C) system. - Identifying the 8348-21C system that needs servicing
Use the blue identify LEDs on the front and rear panels to help you find the system that needs servicing. - Preparing the system to remove and replace internal parts in the 8348-21C
Learn how to prepare the IBM Power System S812LC (8348-21C) system to remove and replace internal parts. - Preparing the system for operation after removing and replacing internal parts for the 8348-21C
Learn how to prepare the IBM Power System S812LC (8348-21C) system for operation after removing and replacing internal parts. - Starting the 8348-21C system
You can use the power button to start the IBM Power System S812LC (8348-21C) system. - Stopping the 8348-21C system
Learn how to stop the IBM Power System S812LC (8348-21C) system to complete another task. - Event sensor status GUI display
The event sensor status GUI display is a way to quickly determine the general health status of the server without having to look at the detailed system event log (SEL) information. - Disconnecting the power cords from an 8348-21C system
Learn how to disconnect the power cords from an IBM Power System S812LC (8348-21C) system. - Connecting the power cords to an 8348-21C system
Learn how to connect the power cords to an IBM Power System S812LC (8348-21C) system. - Placing an 8348-21C system into the service position
Learn how to place an IBM Power System S812LC (8348-21C) system into the service position. - Placing an 8348-21C system into the operating position
Learn how to place an IBM Power System S812LC (8348-21C) system into the operating position. - Removing the service access cover from an 8348-21C system
Learn how to remove the service access cover from an IBM Power System S812LC (8348-21C) system. - Installing the service access cover on an 8348-21C system
Learn how to install the service access cover on a rack-mounted IBM Power System S812LC (8348-21C) system. - Removing the processor baffle from an 8348-21C system
Learn how to remove the processor baffle from an IBM Power System S812LC (8348-21C) system. - Replacing the processor baffle in an 8348-21C system
Learn how to replace the processor baffle in an IBM Power System S812LC (8348-21C) system.
Last updated: Wed, May 24, 2017