If you check out a map or code list and upload changes to it, but then determine that you
no longer want to update it, you can revert the changes. You can also revert changes if you deployed
the resource (map or code list) to Customer Test Environment (CTE). These scenarios do not occur
often.
About this task
The procedure to revert changes rolls back the map or code list to the previous production
version and releases the check out of the resource. For this procedure, the user needs to reset the
current CTE version of the resource to match the version that is live in production. Then, the user
notifies
IBM Support, and
IBM Support finalizes the
reversion.
Important: If the owner of the check-out did not upload a revised version, the
resource owner, the company's admin, or IBM Support can use the Undo
check out function to undo the check-out.
Procedure
-
Download the current production version of the map or code list.
- Go to the Map details page for the map or Code list
details for the code list.
- Click Production.
- For a map, click Source map, Compiled map, and
then Input file to download these assets.
Important: Note the
location where you save the Source map, Compiled map,
and Input file.
Or, for a code list, download Production
code list CSV file.Important: Note the location where you save the
Production code list CSV file.
- For a map, upload the production map files.
- For a map, in the Upload modified map card, select the production
Source map that you saved in step 1.
- Select the production Compiled map that you saved in step 1.
- Select the production Input file that you saved in step 1.
- In Change description, type the following comment. Replace the version
number in the comment with the production version number of the map, and replace the Salesforce
number with your ticket number.Abandoning this round of edits. Resetting the CTE version
to production version X.X. Tracked in Salesforce case number XXXXXX.
- Click Upload to upload the production version of the source map, compiled
map, and input file to Configuration Hub.
Or, for a code list, upload the production code list CSV file.
- For a code list, in the Upload modified code list card, select the
Production code list CSV file that you saved in step 1.
- In Change description, type the following comment. Abandoning
this round of edits. Resetting the CTE version to production version X.X. Tracked in Salesforce case
number XXXXXX.
Important: Replace the version number in the comment with the
production version number of the code list, and replace the Salesforce case number with your ticket
number.
- Click Upload to upload the production version of the code list to
Configuration Hub.
- If you did not deploy the map changes that you want to revert to CTE, skip to step 4. If
you deployed the changes that you want to revert to CTE, in the Deploy to CTE
card, click Deploy to CTE.
- Submit an update to your Salesforce case number to confirm that you reset the CTE version
of the map or code list to the previous production version. Additionally, request that IBM Support mark the map or code list status as FINAL.
- IBM Support marks the map or code list status as
FINAL.
When the map or code list is marked FINAL, the check-out is released.
When map or code list changes are reverted, no corresponding production version exists for that
CTE resource version.
For example, if you upload map assets (or deploy to CTE) for version 2.1 of map ABC
and then revert the map changes, the reverted 2.1 map assets are available in CTE but not in
production.
What to do next
If you want IBM Support to make map changes, open
a Map Change Request according to your usual procedure. If you want to lock or check out a code
list, refer to Locking and checking out a code list.