Maximo Application Suite
Customer-managed

Activating Maximo Health and Predict - Utilities

Note:

Starting in Maximo Application Suite 8.11, Maximo Health and Predict - Utilities is no longer available as a separate industry solution. The information that is provided is applicable only to Maximo Application Suite 8.10 and earlier versions. For more information, see Upgrading IBM Maximo Application Suite versions. Before you upgrade to Maximo Application Suite 8.11, deactivate and delete Maximo Health and Predict - Utilities.

After deployment is complete, the Activate button is enabled. The industry solution might appear in the Suite navigator but might not be ready to use immediately. Activating the industry solution does not automatically grant your users access to the industry solution. As an administrator, you must grant users access to it.

Before you begin

Important:

Maximo Application Suite supports Cloud Pak for Data 4.6 with Python 3.10.

Note:
  1. Specify the root URL for Watson Studio.
  2. Specify the Watson Studio username.
  3. Specify the Watson Studio password.
  4. Click Show advanced settings to configure the Watson Studio project ID. To retrieve the project ID, open your project and then copy the project ID from the page URL.
  5. Maximo Health and Predict - Utilities uses the most recent version of Python to deploy notebooks. If you need to specify the Python version manually, complete the following steps.
    1. In the Red Hat® OpenShift® console, open the mas-<instanceID>-hputlities project.
    2. From the side navigation menu, select Workloads > ConfigMaps and then click Create ConfigMap.
    3. Replace the Python version, for example, type Python 3.10, apiVersion v1, kind ConfigMap, metadata , name hputilities-watsonstudio-project-envname, data , PYTHON_ENV_NAME Python version.
  6. Save your changes.

Procedure

  1. On the Maximo Health and Predict - Utilities page, click Activate.
  2. On the Health and Predict - Utilities details page, configure your Watson Studio instance or use the system-managed options. If System managed is set to on, the project ID is <instanceID>-<workspaceID>-hputilities
  3. Click Activate.
  4. On the confirmation page, click Activate. The estimated deployment time is an estimate of the time that it takes to activate the industry solution. You can track the activation process on the Maximo Health and Predict - Utilities details page or review the logs for the instance name-hputilities-entitymgr-ws-string pod.
    Login to the Red Hat OpenShift cluster and then check the Maximo Health and Predict - Utilities deployment status by running the Red Hat OpenShift client command line.
    oc get hputilitiesworkspace -n mas-devtest-hputilities

    The following output shows an example of the status: NAME         VERSION STATUS AGE devtest-masdev 8.5.0 Ready    2d2h

    After the industry solution is activated, it is available in the Suite navigator and at specific URLs.

What to do next

For next steps, review Getting started as an application administrator.