IBM Support

Step-by-step example of applying Component Refresh 3 (CR3) to IBM Connections 6.0 with CCM

Preventive Service Planning


Abstract

This document illustrates the steps followed by one administrator to upgrade a server from IBM Connections 6.0 CR2 to IBM Connections 6.0 CR3.

Content

The attached document illustrates the steps followed by one administrator to apply IBM Connections 6.0 CR3 where everything is installed on a single Windows 2012 server. The environment being upgraded is a test environment, so not sized for production.

Before you begin, you should review Update strategy for IBM Connections 6.0 (technote 1999492) for documentation and complete steps.

Upgrade Guide to IBM Connections 6.0 CR3 with Connections Content Manager.pdf

[{"Business Unit":{"code":"BU003","label":"Collaboration Solutions"},"Product":{"code":"SSYGQH","label":"IBM Connections"},"Component":"","Platform":[{"code":"PF002","label":"AIX"},{"code":"PF016","label":"Linux"},{"code":"PF033","label":"Windows"}],"Version":"IBM Connections 6.0","Edition":""}]

Document Information

Modified date:
03 October 2018

UID

ibm10732665