Troubleshooting
Problem
This document describes how to prevent job logs from being produced for batch and interactive jobs.
Resolving The Problem
To prevent a job log from being produced at the completion of a batch job, specify *NOLIST for the message level text of the LOG parameter on the Batch Job (BCHJOB), Submit Job (SBMJOB), Change Job (CHGJOB), Create Job Description (CRTJOBD), or Change Job Description (CHGJOBD) commands. If *NOLIST is specified for the message text value of the LOG parameter, the job log is not produced at the end of a job unless the job end code is 20 or greater. If the job end code is 20 or greater, the job log is produced.
For an interactive job, the value specified for the LOG parameter on the SIGNOFF command takes precedence over the LOG parameter value specified for the job.
For more information, refer to the Work Management manual.
SBMJOB LOG(4 0 *NOLIST)
CHGJOB LOG(4 0 *NOLIST)
CRTJOBD JOBD(QGPL/JOBD) LOG(4 00 *NOLIST)
CHGJOBD JOBD(QGPL/JOBD) LOG(4 00 *NOLIST)
For an interactive job, the value specified for the LOG parameter on the SIGNOFF command takes precedence over the LOG parameter value specified for the job.
SIGNOFF LOG(*NOLIST)
For more information, refer to the Work Management manual.
[{"Type":"MASTER","Line of Business":{"code":"LOB68","label":"Power HW"},"Business Unit":{"code":"BU070","label":"IBM Infrastructure"},"Product":{"code":"SWG60","label":"IBM i"},"ARM Category":[{"code":"a8m3p000000GnsYAAS","label":"Job and Work Management-\u003EJOBLOG"}],"ARM Case Number":"","Platform":[{"code":"PF012","label":"IBM i"}],"Version":"All Versions"}]
Historical Number
3284829
Was this topic helpful?
Document Information
Modified date:
07 October 2024
UID
nas8N1016251