Troubleshooting
Problem
Power supplies for the Netfinity 5600.
Resolving The Problem
The following illustrations show the power supplies and power lights on the server. The server comes with two hot-swap power supplies installed. You can install a third power supply. See Installing a hot-swap power supply for instructions about installing an additional power supply and information about power redundancy.)
NOTE: See Power cords for information about power cords for use with the server in your country or region.
Tower model

Rack model

1 - Power Supply 1: The server comes with two hot-swap power supplies installed. (See Installing a hot-swap power supply for instructions about installing an additional power supply and information about power redundancy.)
2 - Power Supply 2: The server comes with two hot-swap power supplies installed.
3 - Filler Panel: You can remove this filler panel and install a third hot-swap power supply on power supply bay 3.
4 - Power Supply 2 Power Connector: The power cord for power supply 2 connects here.
5 - Power Supply 1 Power Connector: The power cord for power supply 1 connects here.
6 - DC Power Light: This light provides status information about the power supply. During normal operation, both the AC and DC Power lights are on. For any other combination of lights, see Power supply LEDs for more information.
7 - AC Power Light: This light provides status information about the power supply. During normal operation, both the AC and DC Power lights are on. For any other combination of lights, see Power supply LEDs for more information.
Document Location
Worldwide
[{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HWN08","label":"Older System x->Netfinity 5600"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]
Was this topic helpful?
Document Information
Modified date:
28 January 2019
UID
ibm1MIGR-4HPPPX