Product Documentation
Abstract
This document describes upgrade scenarios and supported upgrade paths for IBM Sterling B2B Integrator.
Content
Always check upgrade compatibility before planning an upgrade.
To upgrade the IBM Sterling B2B Integrator environment to a higher version, choose a version compatible with the existing version.
In general, you must upgrade to a version that is released after the existing version.
For example:
- Upgrade from v5.2.6.3_6 (release date July-2018) to v6.0.0.0 (release date August-2018) – Compatible
- Upgrade from v5.2.6.3_9 (release date February 2019) to v6.0.0.0 (release date August-2018) – Not compatible
Refer to Sterling B2B Integrator System Requirements for detailed information on JDK versions in IBM B2B Integrator releases.
Previous Releases:
- 5.2.5_19 or earlier versions
- 5.2.6.0 all versions
- 5.2.6.1_9 or earlier versions
- 5.2.6.2_5 or earlier versions
- 5.2.6.3_12 or earlier versions
Upgrade Paths
The chart below lists the compatible upgrade paths for IBM B2B Integrator releases.
| Supported | Y | Indicates the upgrade is compatible. |
| Intermediate | I | Indicates an in-between upgrade and needs to upgrade further. When you upgrade to the latest Fix Pack release of a particular version, first upgrade to the Base release of that version. This is the Intermediate state. You must later upgrade to the Fix Pack release. Note: Do not use the system if the Base release on a higher version is older than the current release. The system remains in a transient state until you upgrade to the latest Fix Pack release. For example: If you want to upgrade to v6.0.0.1 from v5.2.6.3_9, first upgrade to v6.0.0.0 and later upgrade to v6.0.0.1. You must not use the instance at v6.0.0.0. |
| Not supported | X | Indicates the upgrade is not compatible. |

Note: Starting with version 6.1, there is no intermediate upgrade path. You can upgrade directly to a fix pack without installing the corresponding base or Mod pack. However, you cannot upgrade directly to an _x generic iFix. You must first install the related base version before applying the iFix. For Example,
- If you are upgrading from 5263_16 to 6104, it’s a single‑step upgrade - you can upgrade directly to 6104.
- If you are upgrading from 5263_16 to 6035, you must first upgrade to 603 and then apply the 6035 fix pack.
- If you are upgrading from 6210 to 6211_1, you must first upgrade to the 6211 fix pack and then apply the 6211_1 generic iFix.
Was this topic helpful?
Document Information