Product Documentation
Abstract
IBM System x3850 X5, System x3950 X5 - Front Bezel Installation Movie
Content
Text from the audio portion of the front bezel installation movie
To install the front bezel:
- Position the bezel on the server using the pins on the bezel
and the holes in the chassis for alignment and then press the bezel
in until secured by the latches.
- Here is a closer look at one of the three alignment pins on the
bezel and a hole in the chassis.
For specific instructions for the removal and installation of hardware:
Document Location
Worldwide
[{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"QU04SRF","label":"System x->System x3850 X5->7146"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}},{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"QU04SRO","label":"System x->System x3850 X5->7145"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}},{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"QU04SZB","label":"System x->System x3950 X5->7145"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]
Was this topic helpful?
Document Information
Modified date:
24 January 2019
UID
ibm1MIGR-5086283