IBM Support

Upper bezel installation movie - IBM System x3200

Product Documentation


Abstract

IBM System x3200 - Upper bezel installation movie

Content

Text from the audio portion of the upper bezel installation movie

To install a upper bezel

  1. Insert the two hinge tabs on the right side of the upper bezel into the slots in the chassis then rotate the bezel until secured in place.

Install the lower bezel:

  1. Insert the two tabs at the bottom of the lower bezel into the slots in the chassis and then rotate the top of the lower bezel toward the server until it latches in place.

Install the side cover:

  1. Position the cover over the ledge on the bottom of the chassis.
  2. Rotate the cover toward the server until secured by the latch.
  3. Lock the cover if required

For specific instructions for the removal and installation of hardware.

 

Document Location

Worldwide

Operating System

System x:Operating system independent / None

[{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HW329","label":"System x->System x3200"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
24 January 2019

UID

ibm1MIGR-5071643