Product Documentation
Abstract
IBM System x3200 - Upper bezel installation movie
Content
Text from the audio portion of the upper bezel installation movie
To install a upper bezel
-
Insert the two hinge tabs on the right side of the upper bezel into the slots in the chassis then rotate the bezel until secured in place.
Install the lower bezel:
-
Insert the two tabs at the bottom of the lower bezel into the slots in the chassis and then rotate the top of the lower bezel toward the server until it latches in place.
Install the side cover:
-
Position the cover over the ledge on the bottom of the chassis.
-
Rotate the cover toward the server until secured by the latch.
-
Lock the cover if required
For specific instructions for the removal and installation of hardware.
Document Location
Worldwide
[{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HW329","label":"System x->System x3200"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]
Was this topic helpful?
Document Information
Modified date:
24 January 2019
UID
ibm1MIGR-5071643