IBM Support

Hot-swap power supply installation movie - IBM eServer xSeries 366, 460

Product Documentation


Abstract

Instructions for installing the hot-swap power supply in any xSeries 366 and xSeries 460 server.

Content

Text from the audio portion of the hot-swap power supply installation movie

To install a hot-swap power supply:

With the power supply handle up, insert the power supply. Seat the connector by rotating the handle down, and ensure the release latch engages. Then, connect the power cord.

Note: When the power supply is operational, both the AC and DC LEDs will be lit.

Install the top cover:

  1. Position the cover on the chassis while aligning the tabs on the cover with the slots in the chassis.
  2. Slide the cover toward the front of the system, and secure it with the cover-release latch handle.

Document Location

Worldwide

Operating System

Older System x:Operating system independent / None

[{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HW20Y","label":"Older System x->xSeries 366"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}},{"Type":"HW","Business Unit":{"code":"BU016","label":"Multiple Vendor Support"},"Product":{"code":"HW21J","label":"Older System x->xSeries 460"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
24 January 2019

UID

ibm1MIGR-62925