Question & Answer
Question
Work types
Answer
Work types
Work types describe the type of work that was or willbe performed. For example testing or maintenance.
The work types comma-separated value file defines thework types to be used by IBM? Work Optimization for Water Utilities. The file mustbe named work_type.csv.
Work_typeDescription
- Work_type is a short form for a defined worktype. Work_type can be up to 20 characters in length.
- Description is a description of the definedwork type. Description can be up to 80 charactersin length.
If a value contains non-alphanumeric charactersfor example spaces or symbols the value must be enclosed in quotationmarks. Otherwise surrounding values with quotation marks is optional.Values cannot include double or single quotation marks. All valuesmust be separated by commas.
Thefollowing work types are defined as samples in IBM Work Optimization for Water Utilities:
| Work type | Description |
|---|---|
| ABAND | Abandonment |
| ADM | Administrative support |
| CC | Capital construction |
| CCTV | Closed circuit television (CCTV) sewer line |
| CIP | Capital improvement program (CIP) |
| CM | Maintenance - Corrective |
| COMM | Commercial project |
| DR | Drainage |
| ELSYS | Building - Electrical system |
| EM | Maintenance - Emergency |
| EMERG | Investigation - Emergency |
| ER | Equipment reliability |
| EV | EV |
| EXENV | Building - Exterior envelope |
| FLDPM | Maintenance - Field-initiated preventative |
| FLSH1 | Flush - Customer complaint - Not urgent |
| FLSH2 | Flush - Total Coliform Rule (TCR) site |
| FLSH3 | Flush - Routine monitoring |
| FLSH4 | Flush - Flushing zone assessment |
| FLSH5 | Flush - Retest based on flush activity |
| FLSH6 | Flush - Customer complaint - Urgent |
| FLTST | Flow test |
| FNSHG | Furnishings and accomodations |
| GRNDS | Exterior grounds |
| HK | Housekeeping |
| HKETS | Housekeeping - Engineering |
| HKFM | Housekeeping - Facilities management |
| HKMT | Housekeeping - Maintenance |
| HKPM | Housekeeping - Preventative maintenance |
| HKWT | Housekeeping - Wastewater treatment |
| HVAC | Heating ventilation air conditioning (HVAC) |
| INFIN | Interior finishes |
| INSP | Inspection |
| INV | Investigation - Non-emergency |
| JNCST | Janitorial or custodial support |
| MESYS | Building - Mechanical systems |
| MOC | Management of change |
| OR | Operating resources |
| PA | Personnel accommodation |
| PC | Permit compliance |
| PD | Maintenance - Predictive |
| PDA | Property disposal |
| PLUMB | Plumbing - Domestic |
| PLUMR | Plumbing - Plumber report |
| PM | Maintenance - Preventative |
| PRMIT | Permit |
| PROJ | Project |
| PSR | Public space restoration |
| RCNFG | Reconfiguration |
| RDESN | Redesign |
| RENOV | Renovation |
| RESPM | Maintenance - Rescheduled preventative |
| SA | Safety |
| SASEC | Safety and security |
| SCONN | New connection to sewer main |
| SHCIP | Valve shut - For CIP work test |
| SHDEV | Valve shut - For developer |
| SHENG | Valve shut - For environmental testing |
| SHINV | Valve shut - For investigation |
| SHMTR | Valve shut - For meter operation |
| SHSR | Valve shut - For system repair |
| SINE | Signage |
| SP | Special projects |
| TAP | New tap insertion on main |
| TEST | Test water samples |
| WCONN | New connection to main |
| WMSET | Water meter set |
| WQ | Water quality issue |
| WSAC | Water and sewer availability certification |
- When IBM Work Optimization for Water Utilities isinitially installed all sample values can be replaced with valuesmatching the input that will be used in the production system.
- If additional values are required these values can be added.