Question & Answer
Question
Integrating water meter data
Answer
Integrating water meter data
Water meter data can be integrated with IBM? Work Optimization for Water Utilities by extractingthe data into a comma-separated value (CSV) file and loading the datainto IBM Work Optimization for Water Utilities.
As water is consumed water pressure activates a water meter andthe usage is recorded by the meter register. For the usage to be transmittedthe meters must be equipped with absolute encoder registers. Theseregisters interface with AMR systems to transmit the reading digitally.
Each water meter register is a Meter Transmission Unit (MTU) thattransmits the reading by a periodic radio signal to a Data CollectionUnit (DCU). The DCU data is consolidated into a central database.The central database then transfers the readings to the customer?sMDM system.
MDM data to be used with IBM Work Optimization for Water Utilities must be extractedinto a CSV file and imported into IBM Work Optimization for Water Utilities.
Was this topic helpful?
Document Information
Modified date:
08 December 2018
UID
ibm10756807