Troubleshooting
Problem
When running Database Optimisation with Remove Period Zero Values for periods e.g. 2024 and 2025, the following error occurs:
Number: 5
Source: FrangoDirect.Optimize.DeletePeriodZeroValues#System.Web.Services
Description: System.Web.Services.Protocols.SoapException: Server was unable to process request.
---> System.Exception: Communication link failure
TCP Provider: Timeout error [258].
Document Location
Worldwide
[{"Type":"MASTER","Line of Business":{"code":"LOB10","label":"Data and AI"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSY853","label":"IBM Controller"},"ARM Category":[{"code":"a8m3p0000008uDJAAY","label":"Controller-\u003EBA - Cognos Controller"},{"code":"a8m50000000KzMEAA0","label":"Controller-\u003EBA - Cognos Controller-\u003EOptimize Database"}],"ARM Case Number":"","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"11.1.0;11.1.1;11.1.2"}]
Log InLog in to view more of this document
This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.
Was this topic helpful?
Document Information
Modified date:
25 November 2025
UID
ibm17252527