IBM Support

PH64088: ENHANCEMENT TO ENABLE DAI TCP SERVER FOR IPV6 COMMUNICATIONS

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as new function.

Error description

  • This APAR enhances DAI TCP server to support IPv6
    communications.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of IBM IMS Tools Base for z/OS     *
    *                 Version 1 Release 7 (FMID: HAHN170) who use  *
    *                 Distributed Access Infrastructure.           *
    ****************************************************************
    * PROBLEM DESCRIPTION: Distributed Access Infrastructure (DAI) *
    *                      TCP server is enhanced to support IPv6  *
    *                      communication.                          *
    *                                                              *
    ****************************************************************
    * RECOMMENDATION: Apply the PTF for this APAR.                 *
    ****************************************************************
    This enhancement enables the DAI TCP server to support IPv6
    communication. A new parameter, IPVersion, is added to the TCP
    server configuration parameter member to specify the Internet
    Protocol version. When the DAI TCP server is started with IPv6
    specified for this parameter, the DAI TCP server operates as an
    IPv6 application and enables IPv6 communication.
    
    Additionally, to support this enhancement, the ISPF interface
    for IMS Tools Setup is updated to allow specification of the
    IPVersion parameter in the TCP server configuration.
    

Problem conclusion

Temporary fix

Comments

  • The following modules have been modified:
    AIINPARM AIINSSEC AIINSTI4 AIINTCP AIINTCPM AIIUIVP AIINTCPS
    HKTQHCA3 HKTQPCA3 HKTQSETV
    

APAR Information

  • APAR number

    PH64088

  • Reported component name

    IMS TOOLS BASE

  • Reported component ID

    5655V9300

  • Reported release

    170

  • Status

    CLOSED UR1

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    YesSpecatt / New Function / Xsystem

  • Submitted date

    2024-11-11

  • Closed date

    2025-09-05

  • Last modified date

    2025-10-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UO04777

Modules/Macros

  • AIINPARM AIINSSEC AIINSTI4 AIINTCP  AIINTCPM AIINTCPS AIIUIVP
    HKTQHCA3 HKTQPCA3 HKTQSETV
    

Fix information

  • Fixed component name

    IMS TOOLS BASE

  • Fixed component ID

    5655V9300

Applicable component levels

  • R170 PSY UO04777

       UP25/09/10 P F509  

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCJN3E","label":"IMS Tools"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"170"}]

Document Information

Modified date:
02 October 2025