How To
Summary
Cross migration is used when the host system of the target version is different than the host system of the existing version. This page describes the cross migration process when either both or one of the source and target GKLM setups are configured with HSM.
Document Location
Worldwide
[{"Type":"MASTER","Line of Business":{"code":"LOB76","label":"Data Platform"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSTJE47","label":"IBM Security Guardium Key Lifecycle Manager"},"ARM Category":[{"code":"a8m0z000000cvdfAAA","label":"SKLM-\u003ECONFIGURATION-\u003EHSM"}],"ARM Case Number":"","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"All Versions"}]
Log InLog in to view more of this document
This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.
Was this topic helpful?
Document Information
Modified date:
18 January 2022
UID
ibm16538364