IJ36905: DURATION VALUE TOOLTIP DISCREPANCY BETWEEN GRAPHICAL ASSIGNMENTS AND GRAPHICAL WORK WEEK

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • The Duration displayed in the Tooltip will be different in the
    Graphical Assignments and Graphical Work View applications. This
    is dependent on the Work Order being Interruptible or not and
    based on the use of Refresh Work list option.
    
    STEPS TO REPRODUCE:
    1. Create a Work Order with
    
    Scheduled Start:  12/13/21 7:00 PM
    Scheduled Finish: 12/15/21 7:45 PM
    Duration 10 hours
    Interruptible = YES
    
    2. Create a Graphical Assignment list with the above Work Order
    3. Move to Work View tab
    
    Obs:
    
    - the tooltip (ALT+click) will show a duration of 48:45 hours
    - after Refresh the work list, the duration is 10 hours
    
    4. Create a Graphical Work Week list with the above Work Order
    5. Move to Graphical Work Week
    
    Obs:
    
    - the tooltip (ALT+click) will show a duration of 48:45 hours
    - after Refresh the work list, the duration is 16 hours
    
    6. Change the Work Order to Interruptible = NO
    7. Check the above Graphical Assignment
    
    
    Obs:
    
    - the tooltip (ALT+click) will show a duration of 10 hours
    - after Refresh the work list, the duration is 48:45 hours
    
    8. Check the above Graphical Work Week
    
    Obs:
    
    - the tooltip (ALT+click) will show a duration of 16 hours
    - after Refresh the work list, the duration is 48:45 hours
    
    RESULT:
    
    The Duration will be different in the Graphical Assignments and
    Graphical Work View applications, based on the Work Order being
    Interruptible or not and based on the use of Refresh Work list
    option. The values displayed are:
    - the duration in the Work Order (10 hours) : displayed in
    Graphical Assignment
    - the difference between the End Date and Star Date in shift
    hours (16 hours, 8 hours on 2 days) : displayed in Graphical
    Work Week
    - the difference between the End Date and Star Date in total
    hours (48:45 hours) : displayed on Graphical Assignments and
    Graphical Work View applications, before and after refresh
    
    EXPECTED RESULT:
    The Duration value in the tooltip should be the same in both
    Graphical Assignments and Graphical Work View, when the Work
    Order is Interruptible and regardless of the use of Refresh the
    Work List
    
    REPORTED IN VERSION:
    Tivoli's process automation engine 7.6.1.2
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Scheduler users                                              *
    ****************************************************************
    

Problem conclusion

  • The fix for this APAR will be contained in a future release.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IJ36905

  • Reported component name

    MAXIMO SCHEDULE

  • Reported component ID

    5724R46SE

  • Reported release

    761

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2021-12-30

  • Closed date

    2023-04-16

  • Last modified date

    2023-04-16

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    MAXIMO SCHEDULE

  • Fixed component ID

    5724R46SE

Applicable component levels

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS9NUN","label":"Maximo Asset Management Scheduler"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"761","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]

Document Information

Modified date:
16 April 2023