Troubleshooting
Problem
Experiencing long wait times (an hour +) for B2B events to be reported in Control Center after IBM Sterling B2B Integrator was upgraded.
IBM Sterling B2B Integrator was upgraded from 526 to 610.
Symptom
B2B Business Processes are not being reporting in Control Center on a timely bases.
Document Location
Worldwide
[{"Type":"SW","Line of Business":{"code":"LOB77","label":"Automation Platform"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SS9GLA","label":"IBM Control Center"},"ARM Category":[{"code":"a8m0z000000cx9aAAA","label":"B2B"}],"ARM Case Number":"TS005415053","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"All Version(s)"}]
Log InLog in to view more of this document
This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.
Was this topic helpful?
Document Information
Modified date:
19 April 2021
UID
ibm16444919