IBM Support

Requirements for Guardium Data Encryption (Vormetric Transparent Encryption) and Guardium Data Protection deployments on AIX

How To


Summary

This article describes requirements for GDE and DAM solutions to safely be installed together. When both products are installed together it is imperative that STAP\KTAP are loaded before to GDE.

Document Location

Worldwide

[{"Type":"MASTER","Line of Business":{"code":"LOB76","label":"Data Platform"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSMPHH","label":"IBM Security Guardium"},"ARM Category":[{"code":"a8m0z000000Gp0IAAS","label":"STAP"}],"ARM Case Number":"TS003582960","Platform":[{"code":"PF016","label":"Linux"}],"Version":"All Versions"}]

Log InLog in to view more of this document

This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.

Document Information

Modified date:
16 May 2024

UID

ibm16245784