Troubleshooting
Problem
A schedule run in RPT with SAP protocol test do not go through when the schedule ramp ups to around 19 VUs. Sometimes agent may crash and cause the test run to fail and else test runs to completion but with a high number of errors.
Symptom
SAP protocol test execution in a schedule with 19 VUs or greater causes the test run to fail.
You can see SAP connection errors, control not found by id errors in the error log view.
Errors seen in Error log view.
RPT test execution fails for more than 19 VUs.
[{"Product":{"code":"SSMMM5","label":"IBM Rational Performance Tester"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Component":"Extension for SAP","Platform":[{"code":"PF033","label":"Windows"}],"Version":"8.3;8.3.0.1;8.3.0.2","Edition":"","Line of Business":{"code":"LOB77","label":"Automation Platform"}}]
Log InLog in to view more of this document
This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.
Was this topic helpful?
Document Information
Modified date:
16 June 2018
UID
swg21633137