IBM Support

Getting alerts from Sterling Control Center when BP ran successfully on Sterling B2B Integrator

Troubleshooting


Problem

Getting alerts when a BP ran successfully on the Sterling B2B Integrator (SI) node. The BP runs successfully, but is run with full persistence and there are a few steps that have status "JMS Queued" and "BP queued" which apparently equate to WF_STATUS 11 and 12. These statuses are apparently being passed to Sterling Control Center (SCC) as "inError true", which in turn causes a return code 8, thus causing alerts to be issued (a rule is set up to alert if return code is not 0).

Symptom

SCC rule is set up to alert if return code is not 0

[{"Product":{"code":"SS9GLA","label":"IBM Control Center"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Component":"--","Platform":[{"code":"PF002","label":"AIX"},{"code":"PF010","label":"HP-UX"},{"code":"PF016","label":"Linux"},{"code":"PF027","label":"Solaris"},{"code":"PF033","label":"Windows"}],"Version":"5.3","Edition":"","Line of Business":{"code":"LOB77","label":"Automation Platform"}},{"Product":{"code":"SS3JSW","label":"IBM Sterling B2B Integrator"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Component":" ","Platform":[{"code":"PF002","label":"AIX"},{"code":"PF010","label":"HP-UX"},{"code":"PF012","label":"IBM i"},{"code":"PF016","label":"Linux"},{"code":"PF027","label":"Solaris"},{"code":"PF033","label":"Windows"}],"Version":"5.2.4;5.2.3;5.2.2;5.2.1;5.2","Edition":"","Line of Business":{"code":"LOB77","label":"Automation Platform"}}]

Log InLog in to view more of this document

This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.

Document Information

Modified date:
19 June 2026

UID

swg21616485