IBM Support

IT29406: JOBS REMAIN IN RUNNING STATE

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Spectrum Control shows many probe jobs as running when they are
    not normally all running at the same time.  Restarting Spectrum
    Control resolved the issue with the job status for now.
    
    Following exception can be found in data/log/*
    
    [Scheduler job completion2] [ScheduleComplete.process] [ERROR]
    Failed to update cluster resource group
    com.ibm.db2.jcc.am.SqlException: [jcc][10120][10943][4.19.49]
    Invalid operation: statement is closed. ERRORCODE=-4470,
    SQLSTATE=null
            at com.ibm.db2.jcc.am.kd.a(Unknown Source)
            at com.ibm.db2.jcc.am.kd.a(Unknown Source)
            at com.ibm.db2.jcc.am.kd.a(Unknown Source)
            at com.ibm.db2.jcc.am.fp.Ab(Unknown Source)
            at com.ibm.db2.jcc.am.gp.j(Unknown Source)
            at com.ibm.db2.jcc.am.gp.f(Unknown Source)
            at com.ibm.db2.jcc.am.gp.setInt(Unknown Source)
            at
    com.ibm.tpc.infrastructure.database.JDBCWrapperPreparedStatement
    .setInt(JDBCWrapperPreparedStatement.java:139)
            at
    com.ibm.tpc.infrastructure.database.DBPreparedStatement.setInt(D
    BPreparedStatement.java:17)
            at
    com.tivoli.itsrm.scheduler.ScheduleComplete.process(ScheduleComp
    lete.java:250)
            at
    com.tivoli.itsrm.scheduler.ScheduleHandler.handle(ScheduleHandle
    r.java:166)
            at
    com.tivoli.itsrm.server.RequestManager$RmThread.run(RequestManag
    er.java:501)
    
    
    EXCEPTION
      java.lang.NullPointerException
            at
    com.ibm.tpc.infrastructure.database.JDBCWrapperConnection.rollba
    ck(JDBCWrapperConnection.java:197)
            at
    com.ibm.tpc.infrastructure.database.DBConnection.rollback(DBConn
    ection.java:44)
            at
    com.tivoli.itsrm.scheduler.Scheduler.connectBad(Scheduler.java:3
    54)
            at
    com.tivoli.itsrm.scheduler.ScheduleComplete.process(ScheduleComp
    lete.java:398)
            at
    com.tivoli.itsrm.scheduler.ScheduleHandler.handle(ScheduleHandle
    r.java:166)
            at
    com.tivoli.itsrm.server.RequestManager$RmThread.run(RequestManag
    er.java:501)  com.tivoli.itsrm.server.RequestManager$RmThread
    run Scheduler job completion2
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * IBM Spectrum Control & Storage Insights users                *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Spectrum Control shows many probe jobs as running when they  *
    * are                                                          *
    * not normally all running at the same time.  Restarting       *
    * Spectrum                                                     *
    * Control resolved the issue with the job status for now.      *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    This APAR adds a check in job status update code.
    It checks before using a db2 connection which has
    been obtained before. If it finds that the connection
    has been closed it re-initializes it.
    

Problem conclusion

  • The fix for this APAR is targeted for the following release:
    
    IBM Storage Insights 3Q19   [ 5.3.4-IBM-SC ]
    IBM Spectrum Control 5.3.4   [ 5.3.4-IBM-SC ]
    
    ( release target September 2019 )
    
    http://www.ibm.com/support/docview.wss?&uid=swg21320822
    
    The target dates for future releases do not represent a formal
    commitment by IBM. The dates are subject to change without
    notice.
    

Temporary fix

Comments

APAR Information

  • APAR number

    IT29406

  • Reported component name

    TPC ADVANCED

  • Reported component ID

    5608TPCA0

  • Reported release

    531

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2019-06-11

  • Closed date

    2019-08-12

  • Last modified date

    2019-08-12

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    TPC ADVANCED

  • Fixed component ID

    5608TPCA0

Applicable component levels

[{"Business Unit":{"code":"BU029","label":"Software"},"Product":{"code":"SSNECY","label":"Tivoli Storage Productivity Center Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"531"}]

Document Information

Modified date:
24 June 2022