A fix is available
APAR status
Closed as program error.
Error description
Spectrum Control shows many probe jobs as running when they are not normally all running at the same time. Restarting Spectrum Control resolved the issue with the job status for now. Following exception can be found in data/log/* [Scheduler job completion2] [ScheduleComplete.process] [ERROR] Failed to update cluster resource group com.ibm.db2.jcc.am.SqlException: [jcc][10120][10943][4.19.49] Invalid operation: statement is closed. ERRORCODE=-4470, SQLSTATE=null at com.ibm.db2.jcc.am.kd.a(Unknown Source) at com.ibm.db2.jcc.am.kd.a(Unknown Source) at com.ibm.db2.jcc.am.kd.a(Unknown Source) at com.ibm.db2.jcc.am.fp.Ab(Unknown Source) at com.ibm.db2.jcc.am.gp.j(Unknown Source) at com.ibm.db2.jcc.am.gp.f(Unknown Source) at com.ibm.db2.jcc.am.gp.setInt(Unknown Source) at com.ibm.tpc.infrastructure.database.JDBCWrapperPreparedStatement .setInt(JDBCWrapperPreparedStatement.java:139) at com.ibm.tpc.infrastructure.database.DBPreparedStatement.setInt(D BPreparedStatement.java:17) at com.tivoli.itsrm.scheduler.ScheduleComplete.process(ScheduleComp lete.java:250) at com.tivoli.itsrm.scheduler.ScheduleHandler.handle(ScheduleHandle r.java:166) at com.tivoli.itsrm.server.RequestManager$RmThread.run(RequestManag er.java:501) EXCEPTION java.lang.NullPointerException at com.ibm.tpc.infrastructure.database.JDBCWrapperConnection.rollba ck(JDBCWrapperConnection.java:197) at com.ibm.tpc.infrastructure.database.DBConnection.rollback(DBConn ection.java:44) at com.tivoli.itsrm.scheduler.Scheduler.connectBad(Scheduler.java:3 54) at com.tivoli.itsrm.scheduler.ScheduleComplete.process(ScheduleComp lete.java:398) at com.tivoli.itsrm.scheduler.ScheduleHandler.handle(ScheduleHandle r.java:166) at com.tivoli.itsrm.server.RequestManager$RmThread.run(RequestManag er.java:501) com.tivoli.itsrm.server.RequestManager$RmThread run Scheduler job completion2
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * * IBM Spectrum Control & Storage Insights users * **************************************************************** * PROBLEM DESCRIPTION: * * Spectrum Control shows many probe jobs as running when they * * are * * not normally all running at the same time. Restarting * * Spectrum * * Control resolved the issue with the job status for now. * **************************************************************** * RECOMMENDATION: * **************************************************************** This APAR adds a check in job status update code. It checks before using a db2 connection which has been obtained before. If it finds that the connection has been closed it re-initializes it.
Problem conclusion
The fix for this APAR is targeted for the following release: IBM Storage Insights 3Q19 [ 5.3.4-IBM-SC ] IBM Spectrum Control 5.3.4 [ 5.3.4-IBM-SC ] ( release target September 2019 ) http://www.ibm.com/support/docview.wss?&uid=swg21320822 The target dates for future releases do not represent a formal commitment by IBM. The dates are subject to change without notice.
Temporary fix
Comments
APAR Information
APAR number
IT29406
Reported component name
TPC ADVANCED
Reported component ID
5608TPCA0
Reported release
531
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2019-06-11
Closed date
2019-08-12
Last modified date
2019-08-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TPC ADVANCED
Fixed component ID
5608TPCA0
Applicable component levels
[{"Business Unit":{"code":"BU029","label":"Software"},"Product":{"code":"SSNECY","label":"Tivoli Storage Productivity Center Advanced"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"531"}]
Document Information
Modified date:
24 June 2022