APAR status
Closed as suggestion for future release.
Error description
Client has created a date dimension in their cube that contains a non-time alternate drill-down level. This level contains 6 different categories of day ranges. This level is based on a text field created in Framework Manager. The problem is occurring when users attempt to drill-through on the "> 150 Days" category. When drilling on any of the other categories in this level, a date range is passed as expected. When "> 150 Days" is drilled on, however, only the category label is passed.. When we look at this category and children in Transformer, I don't see anything out of the ordinary--only valid dates are children.
Local fix
Problem summary
Problem conclusion
Temporary fix
Comments
Due to the number of members in the largest bucket, the filter p redicate is too large to be handled via a drill through. The re commendation is to either create additional buckets to further r educe the number of members in the greatest bucket, or use alter nate filter contraints to limit the number of dates past 150 to something a little more manageable.
APAR Information
APAR number
PM43631
Reported component name
COG8 BI ANALY S
Reported component ID
5724W12AS
Reported release
841
Status
CLOSED SUG
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2011-07-13
Closed date
2012-11-21
Last modified date
2012-11-21
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSEP7J","label":"Cognos Business Intelligence"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"841","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
06 March 2023