IBM Support

Can't draw ControlFlow from join node to the merge node in activity diagram generated in execution mode

Troubleshooting


Problem

This technote provides troubleshooting methods for "IBM Rational Rhapsody" when drawing ControlFlow from join or fork node to merge node in activity diagram generated in execution mode. In case activity diagram of Rhapsody is in execution mode, Forks or Joins cannot be used with merge nodes to stop bad execution and other problems; however if you need to connect Join node with merge node, then dummy activities between them should be used instead. Although you uses dummy activities, you will experience a problem drawing that dummy activity to the merge node.

Symptom

Although you uses dummy activities, you will experience a problem drawing that dummy activity to the merge node.

[{"Product":{"code":"SSB2MU","label":"IBM Engineering Systems Design Rhapsody"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Component":"Rational Rhapsody Developer","Platform":[{"code":"PF016","label":"Linux"},{"code":"PF033","label":"Windows"}],"Version":"7.5.1;7.5.0.1;7.5","Edition":"","Line of Business":{"code":"LOB77","label":"Automation Platform"}}]

Log InLog in to view more of this document

This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.

Document Information

Modified date:
27 May 2022

UID

swg21414606