Loading production data

Question & Answer


Question

Loading production data

Answer


IBM brand Intelligent Water Family IBM Work Optimization for Water Utilities Version 1.0.0

Loading production data

IBM? Work Optimization for Water Utilities providessample data that can be used to test the environment after installation.When testing is complete values appropriate for your organizationneed to be loaded into the system prior to moving the system intoproduction.

About this task

To make IBM Work Optimization for Water Utilities readyfor a production environment do the following.
Procedure
  1. Follow the steps in Loading organization metadata.
  2. Follow the steps in Loading customer account data.
  3. Follow the steps in Integrating the solution.

Results

The data required by IBM Work Optimization for Water Utilities is loaded andthe solution is ready to be used.

Library | Support | Terms of use

(c) Copyright IBM Corporation 2011. All rights reserved.
U.S. Government Users Restricted Rights - Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.

"

[{"Business Unit":{"code":"BU055","label":"Cognitive Applications"},"Product":{"code":"SSMGP8","label":"Smarter Cities"},"Component":"","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"All Versions","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
08 December 2018

UID

ibm10757179