How To
Summary
When trying to take an incremental backup for a virtual machine, it fails as it is unable to get CBT information. It keeps taking a full VM backup instead of an incremental backup.
Document Location
Worldwide
[{"Line of Business":{"code":"LOB69","label":"Storage TPS"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSEQVQ","label":"IBM Spectrum Protect"},"ARM Category":[{"code":"a8m0z00000006kpAAA","label":"Virtual Environments (VE)"}],"ARM Case Number":"","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"All Version(s)"}]
Log InLog in to view more of this document
This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.
Historical Number
TS004880133
Was this topic helpful?
Document Information
Modified date:
26 February 2021
UID
ibm16417225