IBM Support

How to change order of types generated in the code in Rational Rhapsody

Question & Answer


Question

How do you change order of types generated in the code and displayed in the browser of IBM Rational Rhapsody?

[{"Product":{"code":"SSB2MU","label":"IBM Engineering Systems Design Rhapsody"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Component":"General Information","Platform":[{"code":"PF033","label":"Windows"}],"Version":"8.0.2;8.0.1;8.0;7.6.1.2;7.6.1.3;7.6.1.1;7.6.1;7.6.0.1;7.6","Edition":"","Line of Business":{"code":"LOB77","label":"Automation Platform"}}]

Log InLog in to view more of this document

This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.

Product Synonym

Rational Rhapsody

Document Information

Modified date:
27 May 2022

UID

swg21640713