IBM Support

Date format on Report generated by a schedule is not in correct format

Troubleshooting


Problem

A report contains a date field that is formatted as Date with Date Style set to Short.  When the report is run in Report Studio or through the Cognos Console, the date format is MM/DD/YYYY.  When the report is run through a schedule, the date format displays as DD/MM/YYYY.

Document Location

Worldwide

[{"Type":"MASTER","Line of Business":{"code":"LOB76","label":"Data Platform"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSTSF6","label":"IBM Cognos Analytics"},"ARM Category":[{"code":"a8m500000008d78AAA","label":"Reporting"}],"ARM Case Number":"TS009158759","Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"All Versions"},{"Product":{"code":"SS6G84","label":"IBM Cognos Analytics on Cloud"},"Business Unit":{"code":"BU048","label":"IBM Software"},"Component":" ","Platform":[{"code":"","label":""}],"Version":"","Edition":"","Line of Business":{"code":"LOB76","label":"Data Platform"}}]

Log InLog in to view more of this document

This document has the abstract of a technical article that is available to authorized users once you have logged on. Please use Log in button above to access the full document. After log in, if you do not have the right authorization for this document, there will be instructions on what to do next.

Document Information

Modified date:
06 May 2025

UID

ibm16578649