IBM Support

PQ06996: OPERATIONS WITH QUANTITY = BLANK (ALL) ARE SUBMITTED AND OPERATIONS WITH DIFFERENT QUANTITY ARE IN RX STATUS

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • CUSTOMER HAS SPECIAL RESOURCE (SR1) DEFINED QUANTITY=1 AND
    DEVIATION=-1.
    FROM PANEL EQQQMLSL THE FIELD ADJUST QUANTITY HAS BEEN SETTED
    TO 0.
    ALL OPEARATIONS WITH QUANTITY = BLANK (ALL) ARE ANYWAY
    SUBMITTED; IN THE MEANWHILE THE OPERATION WITH DIFFERENT
    QUANTITY ARE CORRECTLY IN RX STATUS.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: ALL OPC/ESA USERS.                           *
    ****************************************************************
    * PROBLEM DESCRIPTION: If an application requires the whole    *
    *                      quantity of a SR, it starts even if the *
    *                      adjust quantity of that SR is not       *
    *                      higher than 0.                          *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    If an operation requires the whole quantity of a SR (that is the
    quantity field was specified as blank), then, when there are no
    other problems for the submission, the operation is submitted
    even if the adjust quantity of the SR is not higher than 0.
    

Problem conclusion

  • The module EQQQQTRY has been modified to check (also in the
    case of a request of all the quantity) that the adjust
    quantity be really higher than 0.
    
    
                             - - -
     THE FOLLOWING OPC/ESA PUBLICATION WILL BE UPDATED:
                             - - -
    +--------------------------------------------------------------+
    |                                                              |
    |TITLE:  OPC/ESA PLANNING AND SCHEDULING                       |
    |                                THE WORKLOAD, SH19437600      |
    |                                                              |
    |PAGES:   93                                                   |
    |CHAPTER: 6          TOPIC: " Specifying operation resource    |
    |                             usage"                           |
    |PARAGRAPH:          FIGURE:                                   |
    |                                                              |
    |  Change the first sentence of the page in such way:          |
    |                                                              |
    |If you leave this field blank, the operation is allocated     |
    |the whole quantity available unless this value is not         |
    |higher than 0, in which case the operation cannot start       |
    |until the adjust quantity becomes higher than 0. Once started,|
    |the operation will allocate the whole quantity available, even|
    |if this value increases after the operation has started.      |
    +--------------------------------------------------------------+
    102Y
    EQQQQTRY
    

Temporary fix

Comments

APAR Information

  • APAR number

    PQ06996

  • Reported component name

    TME 10 OPC V2 R

  • Reported component ID

    5697OPC01

  • Reported release

    102

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    1997-08-05

  • Closed date

    1997-09-02

  • Last modified date

    1997-10-02

  • APAR is sysrouted FROM one or more of the following:

    PN91789

  • APAR is sysrouted TO one or more of the following:

    UQ08844

Modules/Macros

  • EQQQQTRY
    

Publications Referenced
SH19437600    

Fix information

  • Fixed component name

    TME 10 OPC V2 R

  • Fixed component ID

    5697OPC01

Applicable component levels

  • R102 PSY UQ08844

       UP97/09/03 P F709

[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSRULV","label":"IBM Workload Scheduler for z\/OS"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"102","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]

Document Information

Modified date:
02 October 1997