IBM Support

PM93711: WMQ CSQOREXX PANEL CHANNEL DISPLAY FAILS WITH REXX ERROR ERROR RUNNING CSQORLST, LINE 2160: BAD ARITHMETIC CONVERSION

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Using REXX panels to display a channel fails in REXX with
    ***** PAUSE ********
    ***
      2158 *-*                         liststat = word(liststat,2)
           >>>                           ""
      2159 *-*                        end
      2160 *-*                       actchn = actchn + 1
      2160 +++                       actchn = actchn + 1
      1965 +++                  call updtsumm
    *@04A*/
       293 +++       call Buildpanel                    /* Build
           */
       228 +++      call DisplayList
    Error running CSQORLST, line 2160: Bad arithmetic conversion
    as the value for 'actchn' is no longer a valid numeric.
    Level 3 finds this occurs when there is one cluster-receiver
    in PAUSE state with another of the same name in RUN state.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of WebSphere MQ for z/OS Version 7 *
    *                 Release 0 Modification 1 and Release 1       *
    *                 Modification 0.                              *
    ****************************************************************
    * PROBLEM DESCRIPTION: When attempting to list channels via    *
    *                      the WebSphere MQ Ops and Control        *
    *                      panels, the panel may terminate with    *
    *                      "Error running CSQORLST, line 2159: Bad *
    *                      arithmetic conversion"                  *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    When listing channels in the Ops and Control panels
    (CSQOREXX), if multiple receiver instances are
    present for a given channel (e.g. a cluster receiver)
    and some of those channels are in a PAUSED state, then
    the panel may terminate with the following error:
    
      2159 +++                       actchn = actchn + 1
      1966 +++                  call updtsumm
       294 +++       call Buildpanel
       229 +++      call DisplayList
    Error running CSQORLST, line 2159: Bad arithmetic conversion
    

Problem conclusion

  • When attempting to correlate multiple instances of the same
    named channel, the code does not anticipate that some of the
    instances might be in a PAUSED state.
    
    Processing has been amended to ensure that channels in a PAUSED
    state are correlated correctly.
    010Y
    100Y
    CSQORLST
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM93711

  • Reported component name

    WMQ Z/OS V7

  • Reported component ID

    5655R3600

  • Reported release

    010

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2013-07-24

  • Closed date

    2013-10-03

  • Last modified date

    2013-11-04

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UK98169 UK98170

Modules/Macros

  • CSQORLST
    

Fix information

  • Fixed component name

    WMQ Z/OS V7

  • Fixed component ID

    5655R3600

Applicable component levels

  • R010 PSY UK98169

       UP13/10/16 P F310

  • R100 PSY UK98170

       UP13/10/16 P F310

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.0.1","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
04 November 2013