Abstract: Attempts to select Policy as 'Merge existing packages' does not update/modify the Flowchart diagram during Reverse Engineering in IBM Rational Rhapsody Error Description: 1. Open or create a Rational Rhapsody project 2. Reverse Engineer a source file (with Flowchart creation) into it 3. Open the Flowchart 4. Add an if statement in the source file and again Reverse Engineer the same into Rational Rhapsody Notice that even though the option 'Merge existing packages' is checked for Policy still the Flowchart diagram is not updated. However the corresponding Function implementation gets updated. Workaround: Use the option 'Overwrite Existing packages'. However this option deletes or ignores any changes that were applied before Reverse Engineering
Local fix
Problem summary
Selecting Policy as "Merge existing packages" does not update/modify the Flowchart diagram during Reverse Engineering
Problem conclusion
Fixed in 8.0.5
Temporary fix
Comments
APAR Information
APAR number
PM92172
Reported component name
TLOGIC RHAPSODY
Reported component ID
5724V74RP
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2013-07-01
Closed date
2013-12-12
Last modified date
2013-12-12
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
TLOGIC RHAPSODY
Fixed component ID
5724V74RP
Applicable component levels
R805 PSY
UP
[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SS7P9W","label":"Rational Rhapsody"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Line of Business":{"code":"LOB59","label":"Sustainability Software"}}]
Document Information
Modified date:
02 November 2021