Fixes are available
APAR status
Closed as program error.
Error description
Problem Subject: Slow of compiling EGL source code Problem Description: It takes time to save and compile an EGL source code with handreds of top level functions. This happens on large workspace contains many top level functions.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: * **************************************************************** * PROBLEM DESCRIPTION: * **************************************************************** * RECOMMENDATION: * **************************************************************** When files that contain a large number of top level functions were modified, the subsequent build following the save took a large amount of time. This was due to all parts that referenced the top level functions being compiled as well.
Problem conclusion
Code has been changed so that the parts that reference the top level functions in the file do not have to recompiled.
Temporary fix
Comments
APAR Information
APAR number
PM74796
Reported component name
RATL BUS DEV
Reported component ID
5724S5000
Reported release
801
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2012-10-10
Closed date
2013-03-11
Last modified date
2013-03-11
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
RATL BUS DEV
Fixed component ID
5724S5000
Applicable component levels
R801 PSN
UP
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSMQ79","label":"Rational Business Developer"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.0.1","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
11 March 2013