PM11068: Failing email rule leaves inconsistent ClearCase UCM activities

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • In the UCM integration, if a ClearQuest email rule is triggered
    during the linking of a ClearCase activity to a ClearQuest recor
    d, a failure of the email rule will prevent the correct completi
    on of the process and leave a ClearCase activity in an inconsist
    ent state. Further attempts to use the same activity will throw
    the error message:
    
    Could not perform requested operation : a UCM/ClearQuest data in
    consistency may exist
    
    Activity 'activity XXXXXX.YYYYYY' should be linked but is not
    
    Use cleartool chproject -crmenable or project properties to corr
    ect this.
    
    
    The CC activity cannot be used until it is fixed with
    
    cleartool checkvob -ucm -fix -view VIEWNAME activity:activity XX
    XXXX.YYYYYY@/vobs/PVOB_NAME
    
    Once fixed it can be normally used for check-ins and check-outs
    even if the email rule continues to fail on those operations.
    
    There are basically two scenarios leading to the inconsistent ac
    tivity:
    
    1. Checking -in or -out a file the user chooses to create a new
    ClearQuest record
    2. The ClearQuest record is created in advance and the user sele
    cts that record on the check-in/-out operations.
    
    In both cases a new ClearCase activity should be created matchin
    g the new (case 1) or existing (case 2) ClearQuest record. Both
    1 and 2 imply actions (typically 'Modify') on the ClearQuest rec
    ord that may trigger an email rule. If the email rule fails (for
     example because of a temporary unavailability of the SMTP serve
    r), the ClearCase user will receive the corresponding error mess
    age when trying to complete the operation (OK button). The only
    way out of the check-in/-out dialog box will be to select 'Cance
    l'.
    This leaves the a ClearCase activity with the correct Title, but
     actually unlinked to the ClearCase record.
    
    Steps to reproduce:
    
    1. Set up a UCM integration.
    2. In CQ, create an email rule to be triggered on 'Modify' actio
    ns for the UCM integrated record type.
    3. In CQ, make sure that the email rule fails by setting an none
    xistent SMTP server
    4. In CC explorer, check-out a file and select the button 'New..
    .'
    5. Complete the mandatory fields on the CQ form and save the CQ
    record.
    6. Click 'OK' on the 'Check Out' dialog box. The error message f
    rom the email rule pops up.
    7. Accept the error message and select 'Cancel'  on the 'Check O
    ut' dialog box
    8. In CC Explorer select 'My Activities' the activity is listed
    there and looks correct, but trying to set it, you get the error
     message informing of its inconsistent state.
    

Local fix

Problem summary

  • In the UCM integration, if a ClearQuest email rule is
    triggered during the linking of a ClearCase activity to a
    ClearQuest record, a failure of the email rule will prevent
    the correct completion of the process and leave a ClearCase
    activity in an inconsistent state.
    

Problem conclusion

  • A fix is available in ClearCase version 7.1.1.2
    

Temporary fix

Comments

APAR Information

  • APAR number

    PM11068

  • Reported component name

    CLEARQUEST UNIX

  • Reported component ID

    5724G3601

  • Reported release

    701

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2010-03-29

  • Closed date

    2010-06-24

  • Last modified date

    2010-06-24

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    CLEARQUEST UNIX

  • Fixed component ID

    5724G3601

Applicable component levels

  • R701 PSN

       UP

[{"Business Unit":{"code":"BU053","label":"Cloud & Data Platform"},"Product":{"code":"SSSH5A","label":"Rational ClearQuest"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.0.1","Edition":"","Line of Business":{"code":"LOB45","label":"Automation"}}]

Document Information

Modified date:
24 June 2010