APAR status
Closed as suggestion for future release.
Error description
1) A ONE PHASE ONE FUNCTION PLAN IS SUBMITTED TO A NODE THAT IS IN THE DRD BUT THE VTAM LU IN THE DRD IS INCORRECT AND HAS NOT BEEN ACTIVATED BY VTAM. THE NODE IS DEFINED TO NDM AS AN INTERMEDIATE NODE. 2) MSGNDM0086E LOGICAL UNIT IS NOT AVAILABLE. 3) NODE IS HELD HRETRY FOR RETINT. 4) WHILE NODE IS HELD, THE CUSTOMER DELETED THE PHASE/NODE. HE CHECKED THE NODE DEFINITION IN THE DRD AND SAW THE ERROR (THIS WAS VIA IOF). 5) THE PHASE/NODE DISAPPEARED FROM IOF. 6) WHEN RETINT EXPIRED, THE PHASE ATTEMPTED TO EXECUTE AS SEEN BY MESSAGES. IT WAS THEN HRETRY AGAIN. 7) THIS HAPPENED REPETITIVELY UNTIL NUMBER OF RETRY'S EXPIRED. *************************************************************** ALTHOUGH THE PHASE NO LONGER DISPLAYED AFTER THE DELETE AND APPEARED TO BE DELETED, THERE WAS STILL AN ATTEMPT TO EXECUTE THE PLAN. THERE WAS NO ATTEMPT TO BROWSE THE PLAN BY GIX, SO I DON'T KNOW WHAT THAT WOULD HAVE SHOWN.
Local fix
Problem summary
Problem conclusion
Temporary fix
Comments
APAR PL79393 HAS BEEN CLOSED AS SUG SINCE THE TCP IS WORKING AS DESIGNED. THE TROUBLE IS CAUSED BY AN ERRONEOUS NODE DEFINITION IN DRD LEADING THE SCHEDULED PHASE/NODE TO BE IN HRETR STATUS. EVEN THOUGH IT HAS BEEN CORRECTLY DELETED FROM TCF (IT IS NO MORE SHOWED ON IOF), THE RETRIES ARE STILL TAKING PLACE. THIS HAPPENS BECAUSE, AS SOON AS THE SESSION IS ACTIVATED FOR THAT ERRONEOUS LU (1ST TIME), THE TCP ISSUES FROM VTAM THE SAME RC SUCH AS THE LU IS INACTIVE CAUSING THE RETRY MECHANISM FOR OUR PHASE/NODE TO BE SCHEDULED. THE TCP IS NOT ABLE TO DISTINGUISH A NODE DEFINITION ERROR FROM A TEMPORARY ONE (SUCH AS THE LU INACTIVE) BECAUSE VTAM NOTIFIES THE SAME RC IN BOTH CASES. SO, ALL THE CONNECTION RETRIES ARE INEVITABLE.
APAR Information
APAR number
PL79393
Reported component name
NETVIEW DM V1 M
Reported component ID
568501601
Reported release
223
Status
CLOSED SUG
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
1991-03-01
Closed date
1991-03-19
Last modified date
1992-03-03
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Applicable component levels
[{"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSGMWM","label":"Tivoli NetView Distribution Manager"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"223","Edition":"","Line of Business":{"code":"LOB35","label":"Mainframe SW"}}]
Document Information
Modified date:
03 March 1992