IBM Support

PK79885: IMS CONNECT AND CEX INITIALIZATION TAKES TOO MUCH TIME

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • When IMS Connect has connections to an IMSPLEX  and the IMS
    Connect Extension Publisher API is active, a delay may be seen
    in IMS Connect connecting to a CSL address space in the IMSPLEX
    and completing initialization.  This is only present when IMS
    Connect is defined as swappable in the Program Property Table.
    The delay is caused by the way that IMS Connect is setting the
    address space non-swappable as required for the Publisher API.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All Users of IMS Connect Extensions V2.1.    *
    ****************************************************************
    * PROBLEM DESCRIPTION: It can take minutes for IMS Connect to  *
    *                      finish initialization when an IMSPLEX   *
    *                      is being used and the IMS Connect       *
    *                      Extensions Publisher API is active.     *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    It can take minutes for IMS Connect to finish initialization
    when an IMSPLEX is being used and the IMS Connect Extensions
    Publisher API is active. The problem is caused by the way
    that CEX is setting the address space non-swappable as needed
    for the Publisher API. The technique used by CEX is not
    compatible with the technique used by CSL which also sets
    the address space non-swappable.
    

Problem conclusion

  • Module CEXPUBMN has been changed to set the address space
    non-swappable using the SYSEVENT TRANSWAP event which is
    compatable with the way that CSL attemps to set the address
    space non-swappable during ICON initialization.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PK79885

  • Reported component name

    IMS CONNECT EXT

  • Reported component ID

    5655K4800

  • Reported release

    210

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2009-02-03

  • Closed date

    2009-02-24

  • Last modified date

    2009-03-03

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UK44289

Modules/Macros

  • CEXPUBMN CEXTECL
    

Fix information

  • Fixed component name

    IMS CONNECT EXT

  • Fixed component ID

    5655K4800

Applicable component levels

  • R210 PSY UK44289

       UP09/02/27 P F902

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Line of Business":{"code":null,"label":null},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCX88S","label":"IMS Connect Extensions"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"210"}]

Document Information

Modified date:
22 October 2020