A fix is available
APAR status
Closed as program error.
Error description
HP Load gets ABEND01D when reloading (P)HDAM and more than 2GB of data space is required for processing the RAA because it attempts to extend the size of the data space more than 2GB. In addition, HP Load requires a large amount of data space when processing (P)HDAM with a small number of buffers and a large number of empty blocks between root segments in the RAA. This problem makes the ABEND01D more likely.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: All users of IBM IMS High Performance * * Load for z/OS Version 2 Release 1 * * (FMID=H1IM210) * **************************************************************** * PROBLEM DESCRIPTION: HP Load gets ABEND01D when reloading * * (P)HDAM and more than 2GB of data space * * is required for processing the RAA. * **************************************************************** * RECOMMENDATION: Apply the maintenance for this APAR. * **************************************************************** 1. HP Load gets ABEND01D when reloading (P)HDAM and more than 2GB of data space is required for processing the RAA. Because HP Load handles the defined size of the data space incorrectly, and it attempts to extend the size of the data space more than 2GB. 2. HP Load requires a large amount of data space when processing (P)HDAM with a small number of buffers and a large number of empty blocks between root segments in the RAA. This problem makes the ABEND01D more likely.
Problem conclusion
HP Load is modified to handle the defined size of the data space correctly. HP Load is also modified to reduce the buffer usage for RAA by changing the timing of write process.
Temporary fix
Comments
APAR Information
APAR number
PK35064
Reported component name
IMS HIGH PERF L
Reported component ID
5655E0700
Reported release
210
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt
Submitted date
2006-11-21
Closed date
2006-12-06
Last modified date
2007-01-04
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UK20309
Modules/Macros
HPSRBFRM HPSRDSCT HPSRDSPC HPSRFCA0 HPSRHDLD HPSRHDL7 HPSRHDL8 HPSRHDL9 HPSRPTRS HPSRPTR7 HPSRPTR8 HPSRPTR9 HPSRRLDM HPSRRLD7 HPSRRLD8 HPSRRLD9
Fix information
Fixed component name
IMS HIGH PERF L
Fixed component ID
5655E0700
Applicable component levels
R210 PSY UK20309
UP06/12/07 P F612
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCX89F","label":"IMS HP Load"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"2.1.0","Edition":"","Line of Business":{"code":"","label":""}}]
Document Information
Modified date:
04 January 2007