IBM Support

PK07713: ABENDS0C4 OCCURRED IN RELOAD TASK FOLLOWING A TIME-OUT IN PIPE OPEN WAIT IN THE UNLOAD TASK.

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • ABENDS0C4 occurred in HPSRHDL8 in the reload task following a
    time-out in pipe OPEN wait in unload task.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of IMS Parallel Reorganization for *
    *                 z/OS Version 2 Release 1 (FMID=H25N210) that *
    *                 use IPR Driver                               *
    ****************************************************************
    * PROBLEM DESCRIPTION: Pipe open time-out can occur on a       *
    *                      system where CPUs are busy. The maximum *
    *                      wait time can be changed by coding the  *
    *                      PIPEWAIT control statement, but the     *
    *                      statement does not change the maximum   *
    *                      wait time of pipe open.                 *
    *                      If the pipe open time-out occurs, the   *
    *                      Reload task can get to abend 0C4        *
    *                      (ABEND0C4).                             *
    ****************************************************************
    * RECOMMENDATION: Apply the maintenance for this APAR.         *
    ****************************************************************
    Pipe open time-out can occur on a system where CPUs are busy.
    The maximum wait time can be changed by coding the PIPEWAIT
    control statement, but the statement does not change the
    maximum wait time of pipe open. The PIPEWAIT control statement
    should be applied to the maximum wait time of pipe open also.
    If a time-out occurs in opening the pipe between the Unload task
    and the Reload task and the Unload task ended but the Reload
    task is running, an abend 0C4 (ABEND0C4) can occur in the Reload
    task.
    

Problem conclusion

  • The following modules have been modified so that the PIPEWAIT
    control statement can be applied to the maximum wait time of
    pipe open: HPSGCM00, HPSGTP00
    The following module has been modified to avoid an abend 0C4
    in the Reload task when a pipe open time-out occurs: HPSGTE00
    
    *======================*
    * DOCUMENTATION CHANGE *
    *======================*
    The IMS Parallel Reorganization for z/OS Version 2 Release 1
    User's Guide (Document Number: SC27-1180-03) will be modified
    as follows.
                                 * * *
    Chapter 2. IMS Parallel Reorganization Driver
     2.7 Control Statements
      2.7.6 Description of Control Statements for
            Reorganization Manager
       2.7.6.17 PIPEWAIT Control Statement
          PIPEWAIT specifies the amount of time a writer or a reader
       of a pipe can remain in a wait state before IPR Driver issues
       a message and abends.
        _________________________________________________________
       |                                                         |
       | >>__PIPEWAIT__ _(__time__,__pipeID__)_ ______________>< |
       |               |_time__________________|                 |
       |                                                         |
       |_________________________________________________________|
    
       The first parameter time specifies how many of minutes, from
       1 to 1440, a writer or a reader, connecting to the pipe that
    |  is specified by the second parameter pipeID, can remain in a
    |  wait state before IPR Driver issues an error message or
    |  messages and gets to an abend. The parameter applies to both
    |  a wait state in opening the pipe and a wait state in getting
    |  a pipe block to write or read. For the valid pipe IDs, see
       "Notes on pipe ID" in topic 2.7.6.15. If pipeID is not
       specified, pipe ID 1 is used for the second parameter.
       The default time value is 15 for each pipe.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PK07713

  • Reported component name

    IMS PARALLEL RE

  • Reported component ID

    5655F7400

  • Reported release

    210

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2005-06-21

  • Closed date

    2005-06-28

  • Last modified date

    2005-07-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UK04947

Modules/Macros

  •    HPSGCM00 HPSGGPAB HPSGTE00 HPSGTP00
    

Publications Referenced
SC27118003    

Fix information

  • Fixed component name

    IMS PARALLEL RE

  • Fixed component ID

    5655F7400

Applicable component levels

  • R210 PSY UK04947

       UP05/06/30 P F506

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Line of Business":{"code":"LOB35","label":"Mainframe SW"},"Business Unit":{"code":"BU058","label":"IBM Infrastructure w\/TPS"},"Product":{"code":"SSVL5Q","label":"IMS Database Reorganization Expert for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"210"}]

Document Information

Modified date:
06 January 2023