IBM Support

PI72331: CHANGES TO SUPPORT NEW FUNCTIONS IN LOADER SERVER

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • This APAR includes the following changes:
    .
    1. Changes to support 'Virtual Parallel Data' from Loader
       Server. Support must be added for 3 new LOAD keywords:
    .
    ACCEL_HLV_VPD_GROUP - The eight character VPD group name
    ACCEL_HLV_VPD_MEMBERS - The number of members in the VPD group
    ACCEL_HLV_VPD_TIMEOUT - A timeout in seconds that represents the
       amount of time members have to join the group before it is
       closed by VPD.
    .
    2. Update install job to incresase allocation size of SYSCK1
       dataset.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: Users of IBM DB2 Analytics Accelerator       *
    *                 Loader for z/OS.                             *
    ****************************************************************
    * PROBLEM DESCRIPTION: This APAR includes the following        *
    *                      changes:                                *
    *                      1. Changes to support 'Virtual          *
    *                        Parallel Data' from Loader Server.    *
    *                        Support must be added for 3 new       *
    *                        LOAD keywords:                        *
    *                      ACCEL_HLV_VPD_GROUP - The eight         *
    *                       character VPD group name               *
    *                      ACCEL_HLV_VPD_MEMBERS - The number of   *
    *                       members in the VPD group               *
    *                      ACCEL_HLV_VPD_TIMEOUT - A timeout in    *
    *                       seconds that represents the amount of  *
    *                       time members have to join the group    *
    *                       before it is closed by VPD.            *
    *                      2. Update install job to incresase      *
    *                        allocation size of SYSCK1 dataset.    *
    ****************************************************************
    * RECOMMENDATION: APPLY the PTF.                               *
    ****************************************************************
    Code has been changed to correct this condition.
    

Problem conclusion

  • APPLY the PTF.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI72331

  • Reported component name

    IDAA LOADER ZOS

  • Reported component ID

    5639OLA00

  • Reported release

    210

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2016-11-14

  • Closed date

    2017-04-19

  • Last modified date

    2017-05-01

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UI46554

Modules/Macros

  •    HLO$$PRM HLOIN00  HLOSINIT
    

Fix information

  • Fixed component name

    IDAA LOADER ZOS

  • Fixed component ID

    5639OLA00

Applicable component levels

  • R210 PSY UI46554

       UP17/04/28 P F704

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSKRKK","label":"IBM Db2 Analytics Accelerator Loader for z\/OS"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"2.1.0","Edition":"","Line of Business":{"code":"LOB10","label":"Data and AI"}}]

Document Information

Modified date:
12 February 2021