IBM Support

PI41334: Not picking up realized messages

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • Not picking up realized messages
    
    Scenario:
    
    User 1 creates a sequence diagram and auto-realizes everything
    (and saves so its on the server)
    
    User 2 Synchronizes so he sees the sequence diagram
    
    Checking the features for each of the messages shows them to be
    unrealized
    The browser shows two event receptions - but they arent loaded -
    the show up as () - clicking the '+' expands the event reception
    - and loads it - it then appears realized in the diagram
    The operation is nowhere to be seen
    
    User 2 now continues - adding one new message to the diagram
    He auto-realizes
    
    Now req1, req3 and op1 have been created new - and locked
    the original 'unloaded' ones are still there
    Expanding them reveals duplicate event receptions
    Both of them by the way point to the same event (req1)
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Rhapsody 8.1.2.1                                             *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Not picking up realized messages                             *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • Fixed in 8.1.4
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI41334

  • Reported component name

    TLOGIC RHAPSODY

  • Reported component ID

    5724V74RP

  • Reported release

    812

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt

  • Submitted date

    2015-05-19

  • Closed date

    2015-12-22

  • Last modified date

    2015-12-22

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    TLOGIC RHAPSODY

  • Fixed component ID

    5724V74RP

Applicable component levels

  • R812 PSY

       UP

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SS7P9W","label":"Rational Rhapsody"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"8.1.2","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
22 December 2015