IBM Support

PI32278: AFTER ALTERING DSSIZE AND MAXPARTITIONS, REORG A HASH PBG TABLESPACE GETS DSNT500I RC00C200E2.

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • After altering DSSIZE and MAXPARTITIONS, REORG a HASH PBG
    tablespace gets DSNT500I RC00C200E2.
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All DB2 10 for z/OS utility users of         *
    *                 REORG TABLESPACE of a Partition-By-Growth    *
    *                 ( PBG ) table space with hash organization   *
    *                 and pending ALTER(S)                         *
    ****************************************************************
    * PROBLEM DESCRIPTION: REORG TABLESPACE STATISTICS SHRLEVEL    *
    *                      CHANGE of a PBG table space with hash   *
    *                      organization and pending ALTER(S) gets  *
    *                      message DSNT500I and abends with        *
    *                      ABEND04E RC00E40009 at DSNUSEF2+x'1ADA' *
    ****************************************************************
    * RECOMMENDATION: Apply corrective PTF when available          *
    ****************************************************************
    REORG TABLESPACE STATISTICS SHRLEVEL CHANGE of a PBG table space
    with hash organization and pending ALTER(S) gets message
    MSGDSNT500I - RESOURCE UNAVAILABLE REASON 00C200E2 TYPE 220 and
    abends with ABEND04E RC00E40009 at DSNUSEF2 OFFSET1ADA.
    
    The failure occurred because inline statistics processing was
    unable to open the new partition(s) that had been created.  This
    was due to REORG not building certain internal control blocks
    for the new partition(s).  This resulted in the I/J prefix for
    the new partition(s) never being updated.  While this error
    occurred during the inline statistics processing for REORG, any
    operation on the new partition(s) following the REORG would
    result in the error.
    
    This problem can also occur with REORG TABLESPACE SHRLEVEL
    REFERENCE.
    
    ADDITIONAL KEYWORDS: ALTER DSSIZE MAXPARTITIONS RC00C200E2
    

Problem conclusion

  • REORG TABLESPACE code has been changed to resolve the
    aforementioned scenario.
    

Temporary fix

  • *********
    * HIPER *
    *********
    

Comments

APAR Information

  • APAR number

    PI32278

  • Reported component name

    DB2 OS/390 & Z/

  • Reported component ID

    5740XYR00

  • Reported release

    A10

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    YesHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2015-01-07

  • Closed date

    2015-09-22

  • Last modified date

    2015-11-03

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UI31341

Modules/Macros

  •    DSNURWIR
    

Fix information

  • Fixed component name

    DB2 OS/390 & Z/

  • Fixed component ID

    5740XYR00

Applicable component levels

  • RA10 PSY UI31341

       UP15/10/07 P F510 Ž

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU059","label":"IBM Software w\/o TPS"},"Product":{"code":"SSEPEK","label":"Db2 for z\/OS"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"LOB10","label":"Data and AI"}}]

Document Information

Modified date:
06 May 2020