IBM Support

PI31794: WHEN HAVING 2 VISUALISATIONS IN A REPORT WITH A DRILL THRUS FOR EACH.

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed with unknown close code.

Error description

  • They both drill through to the target of the first visualisation
    on the page.
    

Local fix

  • This appears to work correctly in 10.2.2.
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description.                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * Upgrade to IBM Cognos Business Intelligence 10.2.2 Fix Pack  *
    * 1                                                            *
    ****************************************************************
    

Problem conclusion

Temporary fix

Comments

APAR Information

  • APAR number

    PI31794

  • Reported component name

    COG REPORT STUD

  • Reported component ID

    5724W12RS

  • Reported release

    A21

  • Status

    CLOSED URX

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2014-12-18

  • Closed date

    2015-04-19

  • Last modified date

    2015-04-19

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCHNWW","label":"Report Authoring v11x"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
01 May 2020