A fix is available
APAR status
Closed as program error.
Error description
The IMS Monitor Program Trace is incorrectly reporting SLOG 48 COMMIT PHASE 1 events as PHASE 2 when both events occur as part of syncpoint processing inside the I/O PCB GU call. Keywords: PH1 PH2 Phase1 Phase2
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: Users of IMS Performance Analyzer V4.3 * **************************************************************** * PROBLEM DESCRIPTION: Monitor Program Trace incorrectly * * reports SLOG 48 PHASE 1 as PHASE 2. * **************************************************************** * RECOMMENDATION: * **************************************************************** The IMS Monitor Program Trace is incorrectly reporting SLOG 48 COMMIT PHASE 1 events as PHASE 2 when both events occur as part of syncpoint processing inside the I/O PCB GU call.
Problem conclusion
The IMS Monitor Program Trace is corrected to report SLOG 48 (ESAF) events with the correct call type description.
Temporary fix
Comments
APAR Information
APAR number
PI24715
Reported component name
IMS PERF ANALYZ
Reported component ID
5655E1500
Reported release
430
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2014-08-27
Closed date
2014-09-23
Last modified date
2014-10-02
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Modules/Macros
IPIACLND IPISAPAR
Fix information
Fixed component name
IMS PERF ANALYZ
Fixed component ID
5655E1500
Applicable component levels
R430 PSY UI21586
UP14/09/26 P F409
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Line of Business":{"code":null,"label":null},"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSCX8A2","label":"IMS Performance Analyzer"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"430"}]
Document Information
Modified date:
04 October 2020