IBM Support

PI11418: 5C6-00940024 CSQMCTXE,M=CSQGFRCV,LOC=CSQMCLLM.CSQMCTXE+xxxxxxxx

A fix is available

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as program error.

Error description

  • ABN=5C6-00940024,U=SYSOPR ,C=R3600.710.CMC
    -CSQMCTXE,M=CSQGFRCV,LOC=CSQMCLLM.CSQMCTXE+xxxxxxxx
    
     When the queue manager reconnected to RRS, it went through
    resync processing. This included a check for inflight RRS
    agents (ACE) that needed cleaning up. For each WAS ACE, it
    went through the list of existing context blocks (MCTX);
    for the ones that were no longer required, it set the
    interest data to null, freed the control block and scheduled
    deferred end of context processing.
     When the deferred end of context was processed in CSQMCTXE,
    it looked in the interest data to find the relevant context
    ACE. As this was nulls, it expected the current EB's home
    address space, in this case was the queue manager, to be
    used to locate the appropriate connection manager control
    block (MCLB), which didn't have one.
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED: All users of WebSphere MQ for z/OS Version 7 *
    *                 Release 1 Modification 0.                    *
    ****************************************************************
    * PROBLEM DESCRIPTION: The queue manager issues abend          *
    *                      5C6-00940024 when a connected           *
    *                      application address space is abending   *
    *                      and a RRS failure is occurring.         *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    There is a small timing window where RRS resync processing
    driven by the queue manager and end of task processing can
    overlap. This can cause an end of context process that was
    scheduled during RRS resync processing to be running for a
    context where the interest has been deleted by end of task
    processing. This causes end of context processing to look for
    a control block that is no longer allocated, and abend with
    5C6-00940024.
    

Problem conclusion

  • The code was changed to detect this scenario and handle it
    without issuing an abend.
    100Y
    CSQMCTXE
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI11418

  • Reported component name

    WMQ Z/OS V7

  • Reported component ID

    5655R3600

  • Reported release

    100

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2014-02-10

  • Closed date

    2014-04-09

  • Last modified date

    2014-05-02

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

    UI16880 PI44667

Modules/Macros

  • CSQMCTXE
    

Fix information

  • Fixed component name

    WMQ Z/OS V7

  • Fixed component ID

    5655R3600

Applicable component levels

  • R100 PSY UI16880

       UP14/04/23 P F404

Fix is available

  • Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.

[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SG19M","label":"APARs - z\/OS environment"},"Component":"","ARM Category":[],"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"7.1","Edition":"","Line of Business":{"code":"","label":""}}]

Document Information

Modified date:
02 May 2014