IBM Support

PI07351: ERROR ACCESSING DATA IN PUBLISH PACKAGES - DISP_E_EXCEPTION FAILED HRESULT 0X800A0001 UNKNOWN MESSAGE - ANALYST D-LINK

Subscribe

You can track all active APARs for this component.

 

APAR status

  • Closed as Permanent restriction.

Error description

  • Details:?- Client upgraded from 8.4 to 10.2.1 BI and 10.1.1 FP2
    EP and is distributed?- since upgrade client has encountered the
    title error when trying to run an analyst dlink sourcing an fm
    package?- the package they are using does contain a PowerPlay
    cube?- when the powerPlay cube is removed, the error is not
    encountered.?- their configuration of this package has not
    changed from the 8.4 environment?- had them install the Admin
    tools on their EP server as per EP Connections page:
    https://w3-connections.ibm.com/forums/html/topic?id=ec7d0db3-49c
    7-430a-a5be-f958c085f3e1?-
    I AM able to reproduce this issue locally.??Error:?GUI:?Error
    accessing data in publish packages - DISP_E_EXCEPTION Failed
    HRESULT 0x800A0001 Unknown message??PEL:?Unable to run the
    Planning Data Import Service using command:  cd /d "C:\Program
    Files\ibm\cognos\c10\bin"~~"C:\Program
    Files\ibm\cognos\c10\bin\jre\6.0\bin\java.exe" -Xms32M -Xmx128M
    -DentityExpansionLimit=200000 -Dorg.jawin.hardlib="C:\Program
    Files\ibm\cognos\c10\bin\jawin.dll" -jar "C:\Program
    Files\ibm\cognos\c10\bin\epModeledDataImport.jar"
    "C:\WINDOWS\TEMP\DLink go_capex_contributor.omnicom rob seucrity
    added pack114316_ImportFile.xml"
    "010:88a83768-25a6-c412-a4b1-1293d5c7ffca:4002776545"
    "http://localhost:9300/p2pd/servlet/dispatch"Unable to parse the
    Data Manager return xml document.  Please see the
    C:\WINDOWS\TEMP\dmresult_DLink go_capex_contributor.omnicom rob
    seucrity added pack114316_Mon Nov 04 11_43_26 EST 2013.xml log
    file to view information that may have been returned from Data
    Movement Service~~~~~Result was: C:\WINDOWS\TEMP\dmspec_DLink
    go_capex_contributor.omnicom rob seucrity added pack114316_Mon
    Nov 04 11_43_26 EST 2013.xml~C:\WINDOWS\TEMP\dmresult_DLink
    go_capex_contributor.omnicom rob seucrity added pack114316_Mon
    Nov 04 11_43_26 EST 2013.xml~~~~~Unable to run the
    Linkstep.??Failed HRESULT [0x800A0001]: Unknown message
    -2146828287 (0x800a0001) [FormatMessage returned 15105
    (0x3b01)]??From DMRESULT xml:?java.lang.RuntimeException:
    AxisFault reason: The server did something wrong?AxisFault
    details:
    <severity>error</severity><errorCode>caf</errorCode><ns1:message
    ><messageString>DPR-ERR-2014
    Unable to load balance the request because no nodes in the
    cluster are available, or no nodes are configured for the
    service: dataMovementService.??Workaround:?They are looking into
    removing the powerplay cube temporarily, as this allows the link
    to run??Question:?What has changed in this configuration (BI
    10.2.1 + EP 10.1.1 FP2) that causes this error?
    

Local fix

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * All Users                                                    *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * See error description.                                       *
    ****************************************************************
    * RECOMMENDATION:                                              *
    * The issue will not be addressed due to the severity and and  *
    * age. It can be re-opened if new impacts are reported, as     *
    * appropriate.                                                 *
    ****************************************************************
    

Problem conclusion

  • No Intent to Fix
    

Temporary fix

Comments

APAR Information

  • APAR number

    PI07351

  • Reported component name

    COG PLAN CONTRI

  • Reported component ID

    5724W23CO

  • Reported release

    A10

  • Status

    CLOSED PRS

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2013-12-03

  • Closed date

    2014-09-25

  • Last modified date

    2014-09-25

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

Applicable component levels

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSPN2D","label":"Cognos Planning"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"A10","Line of Business":{"code":"LOB10","label":"Data and AI"}}]

Document Information

Modified date:
15 August 2024