IBM Support

PH62647: AD IMPACT ANALYSIS IS STUCK AT 51% ON ECLIPSE/IDZ

Subscribe to this APAR

By subscribing, you receive periodic emails alerting you to the status of the APAR, along with a link to the fix after it becomes available. You can track this item individually or track all items by product.

Notify me when this APAR changes.

Notify me when an APAR for this component changes.

 

APAR status

  • Closed as program error.

Error description

  • A user is trying to run an Impact Analysis report for
    Application Discovery in Eclipse/IDz.
    Their progress indicator gets stuck at 51% and never completes.
    

Local fix

  • n/a
    

Problem summary

  • ****************************************************************
    * USERS AFFECTED:                                              *
    * Impact Analyze Report stuck with 51%                         *
    ****************************************************************
    * PROBLEM DESCRIPTION:                                         *
    * Analyze Client - when running the Impact Analysis on a big   *
    * project, the report does not finish when using a high depth. *
    ****************************************************************
    * RECOMMENDATION:                                              *
    ****************************************************************
    

Problem conclusion

  • The algorithm used is very complex and runs through all possible
    paths in order to create the report. And when setting high
    values for depth, the resulted report can have more than 40k
    pages. Part of the problem comes from the fact that the
    algorithm builds all possible paths and only after that checks
    if they are valid.
    
    Solution: We improved the performance of the algorithm, by
    checking paths at an early stage and removing them from an
    incipient step if they were invalid.
    

Temporary fix

Comments

APAR Information

  • APAR number

    PH62647

  • Reported component name

    APPL DISCOVERY

  • Reported component ID

    5737B1600

  • Reported release

    611

  • Status

    CLOSED PER

  • PE

    NoPE

  • HIPER

    NoHIPER

  • Special Attention

    NoSpecatt / Xsystem

  • Submitted date

    2024-08-07

  • Closed date

    2024-12-05

  • Last modified date

    2024-12-05

  • APAR is sysrouted FROM one or more of the following:

  • APAR is sysrouted TO one or more of the following:

Fix information

  • Fixed component name

    APPL DISCOVERY

  • Fixed component ID

    5737B1600

Applicable component levels

[{"Business Unit":{"code":"BU048","label":"IBM Software"},"Product":{"code":"SSRR9Q","label":"IBM Application Discovery"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"611","Line of Business":{"code":"LOB70","label":"Z TPS"}}]

Document Information

Modified date:
05 December 2024