APAR status
Closed as program error.
Error description
Error Message: The expected SHA1 value differs from the expected (correct) value. . Stack Trace: .
Local fix
Problem summary
This issue is encountered when using java.security.MessageDigest to calculate the SHA-1 hash for a large file >4GB. The problem is only seen for files larger than 4GB. With the default shipped java.security file, the OpenJCEPlus calculated hash value is correct. If IBMJCECCA is at the top of the security provider list, then the calculated value is incorrect.
Problem conclusion
The 32 bit integers overflowed to 0 when more than 4G of data was processed. The APAR will be available in the CR24_02 version. . This APAR will be fixed in the following Releases: . IBM Semeru Runtimes 11 11.0.23.0 17 17.0.11.0 . Downloads and supplementary documentation can be found at the following locations: - For the z/OS operating system: - Java SDK Products on z/OS https://www.ibm.com/support/pages/java-sdk-products-zos
Temporary fix
The temporary fix suggested is to place OpenJCEPlus before IBMJCECCA in the security providers list.
Comments
APAR Information
APAR number
PH61255
Reported component name
JAVA Z/OS 64
Reported component ID
620700104
Reported release
B00
Status
CLOSED PER
PE
NoPE
HIPER
NoHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2024-05-07
Closed date
2024-05-07
Last modified date
2024-06-07
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
Fix information
Fixed component name
JAVA Z/OS 64
Fixed component ID
620700104
Applicable component levels
[{"Business Unit":{"code":"BU054","label":"Systems w\/TPS"},"Product":{"code":"SSNVBF","label":"Runtimes for Java Technology"},"Platform":[{"code":"PF025","label":"Platform Independent"}],"Version":"B00","Line of Business":{"code":"LOB08","label":"Cognitive Systems"}}]
Document Information
Modified date:
07 June 2024