A fix is available
APAR status
Closed as program error.
Error description
A 5C6-00C90D06 abend occurs in CSQIMGE9 due to a mismatch between a message IRH8 and IRH9. Both IRH are for persistent data.
Local fix
Problem summary
**************************************************************** * USERS AFFECTED: All users of IBM MQ for z/OS Version 9 * * Release 2 Modification 0. * **************************************************************** * PROBLEM DESCRIPTION: During deferred write processing, it is * * possible for an 5C6-00C90D06 abend to * * occur. * **************************************************************** The code which handles writing to the log was allowing the page set to get ahead of the log during deferred write processing. This caused the recovery code to not function properly and subsequently abend.
Problem conclusion
The code has been changed to not allow the page set to get ahead of the log.
Temporary fix
Comments
APAR Information
APAR number
PH49909
Reported component name
IBM MQ Z/OS V9
Reported component ID
5655MQ900
Reported release
200
Status
CLOSED PER
PE
NoPE
HIPER
YesHIPER
Special Attention
NoSpecatt / Xsystem
Submitted date
2022-09-29
Closed date
2023-05-18
Last modified date
2023-07-03
APAR is sysrouted FROM one or more of the following:
APAR is sysrouted TO one or more of the following:
UI91883
Modules/Macros
CSQJW101
Fix information
Fixed component name
IBM MQ Z/OS V9
Fixed component ID
5655MQ900
Applicable component levels
R200 PSY UI91883
UP23/06/15 P F306 ¢
Fix is available
Select the PTF appropriate for your component level. You will be required to sign in. Distribution on physical media is not available in all countries.
[{"Business Unit":{"code":"BU011","label":"Systems - zSystems software"},"Product":{"code":"SG19M","label":"IBM MQ"},"Platform":[{"code":"PF054","label":"z Systems"}],"Version":"200"}]
Document Information
Modified date:
03 July 2023